12
ASSEMBLY
CAUTION: Use two people to lift and install the Summit
®
Built-In frame assembly.
a.) Lift the frame assembly into the “island” structure opening. Make sure the frame is resting level on the fi nished surface of
the structure.
b.) Adjust the Front Vent to rest squarely on ground.
c.) Apply a bead of silicone sealant
(1)
around the perimeter and front edges of the grill that are in contact with the “island”
structure. This will prevent moisture seepage. The sealant you use must have a temperature rating above 120°F (48.8° C).
Any Surface
24 inches (610mm)
24 inches
(610mm)
24 inches
(610mm)
Frame
Note: For a countertop treatment
Recommended 3/4 inch (19.1 mm)
overhang. Notch front edge for
frame to fully slide in.
b.
a.
Any Surface
24 inches (610mm)
24 inches
(610mm)
24 inches
(610mm)
Frame
c.
(1)
6
42370_NG BIinstll.indd 12
9/23/05 11:08:27 AM
Summary of Contents for PLATINUM 42370
Page 10: ...10 3 4 ASSEMBLY ...
Page 11: ...11 5 ASSEMBLY ...
Page 13: ...13 7 4B 6B 1 3 2 ASSEMBLY ...
Page 14: ...14 8 1 2 4B 6B ASSEMBLY ...
Page 15: ...15 Match Holder a b c 4B 6B 9 ASSEMBLY ...
Page 16: ...16 10 ASSEMBLY 11 1 4 Drill Bit ...
Page 17: ...17 12 13 ASSEMBLY 14 15 ...