Weaver WA-72B Operation And Service Instructions Manual Download Page 7


 

  

 

      

 

Release Valve Group (upper )  

  -  Pump Assembly (lower) 

 

Release Valve Group and Ball Valve 

 Assembly Derail  

 
 
 

 

 

 

 

  

Ball Valve Replacement 

 

Ball Valve Replacement:

 

1. Remove the Ball Chamber Plug [V].  Remove the Two Balls [X&Z] and the Ball weight [Y]. 

2.  Reassemble with the two new Balls [X&Z], New Plug Gasket [W] and Ball Weight [Y] (reuse the existing 
Ball weight).  Ball Weight is installed between the two balls. 

IMPORTANT

: Whenever it is necessary to loosen or remove the Ball Chamber Plug, the Gasket [W] should 

be replaced with a new one. Oil leakage at this point is usually caused by trying to reuse an old gasket over 
again.  

  

  

 

Reviews: