WE-EF ZFY230 LED Installation And Maintenance Instructions Manual Download Page 1

Surge Protection

This product features built-in surge protection circuitry in compliance with
applicable standards.
For comprehensive protection of a luminaire installation against lightning and 
electrical surges, it is essential to cover mains supply and data input lines at 
the distribution board level, by using respective primary (Type 1) and secondary 
(Type 2) surge arrestors in compliance with EN61643-11/IEC61643-1.

Warning

Ensure that all required surge protection measures are in place and activated 
prior to luminaire installation. Also, disconnect luminaires before operating
high-power devices such as, for example, electrical arc welders.

Do not open during installation

This product is factory-sealed. 
Refer to the instructions contained in this 
document for details.

Installation tools

Mounting hardware used on this product 
includes fasteners with hexalobular socket 
heads (ISO 10664). Installation requires the 
use of matching tools.

WE-EF LEUCHTEN

Installation and Maintenance

Instructions 

Bollard

      ZFY230 LED

Summary of Contents for ZFY230 LED

Page 1: ...IEC61643 1 Warning Ensure that all required surge protection measures are in place and activated prior to luminaire installation Also disconnect luminaires before operating high power devices such as...

Page 2: ...1 IP66 Class I ta 25 C Bollard ZFY230 H 600 mm ZFY230 H 1000 mm Accessories Planted root Galvanised steel kg ESV4 for ZFY230 300 0461 4 4 ESV4 1000 180 600 180...

Page 3: ...th Torx T 20 tool and rotate it anti clockwise until it can be lifted up If the head of the luminaire is returned after maintenance align it to the bollard post as shown below and secure by tightening...

Page 4: ...ensure maximum stability 1 Switch off mains electrical supply 2 Check that rating shown on luminaire label conforms with mains electrical supply 3 A suitable recess to be provided for planted root A E...

Page 5: ...4 Torque Screw Torque M4 max 2 0 Nm M5 max 4 0 Nm M6 max 6 0 Nm M8 max 15 0 Nm M16 max 100 0 Nm...

Page 6: ...5...

Page 7: ...Fax 33 4 74 99 14 40 info france we ef com WE EF HELVETICA Switzerland Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 in...

Page 8: ...WE EF LEUCHTEN Installation and Maintenance Instructions Planted Root ESV4 ESV2 ESV6...

Page 9: ...300 0586 ESV4 300 0464 ESV4 300 0459 Suitability 1 KTX234 2 KTY234 3 ZFY230 4 GRY224 5 Short post Suitability 1 XRY334 2 XRZ334 3 RRY334 4 RRZ334 Suitability 1 CFY259 2 GRY234 3 RRY324 4 RRZ324 5 XRY...

Page 10: ...3 Planted Root ESV2 300 9115 ESV6 300 0824 ESV6 300 0457 Suitability 1 PSY414 424 Suitability 1 AML C 2 FLA461 Suitability 1 LTM440 2 LTM444 3 AMW C 4 AMF C 5 AMF S 6 AML C 240 200 600...

Page 11: ...ate is parallel to the pathway For this installation use 30 mm long M12 bolts supplied 2 Please note ESV4 and ESV6 must be orientated correctly for different products In both instances conduit entry c...

Page 12: ...ts supplie 7 Place the ESV in the form work for concrete pad ensuring orientation position and levels are correct Ensure all openings on ESV are blanked off including mounting plate hole 8 Fit the nom...

Page 13: ...paver or concrete Ensure WKDW IRU DQ LQVWDOODWLRQ PRXQWLQJ DQJH PXVW EH XVK RU KLJKHU WKDQ VXUURXQGLQJ VXUIDFH OHYHO IWHU FRQFUHWH KDV FXUHG IRU VSHFL HG WLPH UHPRYH EODQNLQJ DQG EROWV QVWDOO WWLQJ a...

Page 14: ...d Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 F...

Reviews: