Installation Procedure
Luminaire prewired, do not open!
1) Switch off the mains electrical supply.
2) Cut cable to the corresponding height of the
pole and connect cable to the connector
A
(
fig. 1-6
).
0-10V
Phase (L1) to 1, Neutral (N) to N, Control Phase
(+) to 2, Control Phase (–) to 3 and Earthing
Compare the local voltage and frequency with
date mentioned on the label of the luminaire.
Screw the gland nut together, tightening to a
torque of 5 Nm (44.3 in-lb) (
fig. 5
).
3) Pull the connecting cable through the pole.
Put the luminaire on top of the pole and tighten
the fixing screws
B
, tightening to a torque of
10 Nm (88.6 in-lb).
fig. 1
fig. 4
fig. 7
fig. 2
fig. 5
fig. 3
fig. 6
A
B
5 Nm
(44.3 in-lb)
PE ~ 180°
~ 2.5 in
WE-EF Supply Cable Connector Accessory Instructions