background image

Installation Procedure

Luminaire prewired, do not open!

1)  Switch off the mains electrical supply.

2)  Cut cable to the corresponding height of the 

pole and connect cable to the connector 

A

 

(

fig. 1-6

).

0-10V

Phase (L1) to 1, Neutral (N) to N, Control Phase 
(+) to 2, Control Phase (–) to 3 and Earthing 

Compare the local voltage and frequency with 
date mentioned on the label of the luminaire.

Screw the gland nut together, tightening to a 
torque of 5 Nm (44.3 in-lb) (

fig. 5

).

3)  Pull the connecting cable through the pole. 

Put the luminaire on top of the pole and tighten 
the fixing screws 

B

, tightening to a torque of 

10 Nm (88.6 in-lb).

fig. 1 

fig. 4 

fig. 7 

fig. 2 

fig. 5 

fig. 3 

fig. 6 

A

B

5 Nm 

(44.3 in-lb)

PE ~ 180°

~ 2.5 in

WE-EF Supply Cable Connector Accessory Instructions

Reviews: