background image

3

Installation

The product must be installed and maintained by a 

VXLWDEO\TXDOLƂHGSURIHVVLRQDOLQFRPSOLDQFHZLWKODWHVW

 

building/construction and/or electrical regulations and 
relevant legislation.

Warning:

 Switch off mains electrical supply prior to 

installing and connecting the luminaire.

Notice:

,IWKHOXPLQDLUHLVPRGLƂHGE\DQ\ERG\RWKHU

than the original manufacturer, then the warranty will 
no longer be valid and shall become the full respon-
sibility of the modifying person/organisation. Claims 
based on defects attributable to improper installation 
and/or application, and the consequences thereof, are 
excluded.

The installation on site must comply with local and/or 
national health and safety regulations.

Summary of Contents for PSY424 LED

Page 1: ... respective primary Type 1 and secondary Type 2 surge arrestors in compliance with EN61643 11 IEC61643 1 Warning Ensure that all required surge protection measures are in place and activated prior to luminaire installation Also disconnect luminaires before operating high power devices such as for example electrical arc welders Do not open during installation This product is factory sealed Refer to...

Page 2: ...4 16 1 for PTY414 13 3 for PTY424 19 0 Accessories Planted root Galvanised steel kg ESV2 for PSY414 424 300 9115 3 8 ESV2 for PTY414 424 300 9115 3 8 ESV2 Bollard PSY414 PSY424 PTY414 PTY424 190 180 75 304 800 100 90 ø 14 5 180 260 180 75 440 1000 100 90 ø 14 5 180 ...

Page 3: ...pecial maintenance work is required Do not use high pressure cleaners In case of component failure due to abnormal circumstances or at end of life replacement must be carried out E D VXLWDEO TXDOLƂHG DQG WUDLQHG SURIHVVLRQDO Warning Do not open luminaire while mains supply is switched on ...

Page 4: ...talling and connecting the luminaire Notice I WKH OXPLQDLUH LV PRGLƂHG E DQ ERG RWKHU than the original manufacturer then the warranty will no longer be valid and shall become the full respon sibility of the modifying person organisation Claims based on defects attributable to improper installation and or application and the consequences thereof are excluded The installation on site must comply wi...

Page 5: ...cal supply 4 Lift tabs H and remove terminal box cover C as shown 2 Remove sleeve A from post B 3XOO FDEOH WKURXJK FHQWUH KROH DQG VFUHZ ƃDQJH plate E with M12 bolts nuts to ground Ensure proper orientation of terminal box An optional planted root is available Note Planted root installation instruction is available in additional document ...

Page 6: ...able s with strain relief s 7 Return terminal box cover C and push until tabs H engage with pins 5 Check that rating shown on luminaire label conforms with mains electrical supply example PSY424 220 240V 50 60 Hz 114 XXXX SOE XXXXXXX LED 4000K 18W item no XXX 08 18 IP66 8 Place sleeve A over post B with sticker I pointing up as shown ...

Page 7: ...om head K with Torx 25 tool supplied by WE EF 9 Engage sleeve A LQWR ƃDQJH SODWH E good and bad engagement 12 Place head K over sleeve A and check for alignment ƃXVK 11 Hold head K under arm Grab socket L connect and tighten with plug M ...

Page 8: ...7 13 Tighten recessed screws N gradually in alternating sequence 6 Nm with Torx 30 tool supplied by WE EF 14 Return countersunk screws J into head and tighten ...

Page 9: ...nfo switzerland we ef com WE EF LIGHTING United Kingdom Tel 44 844 880 5346 Fax 44 844 880 5347 info uk we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFLƂF ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 Fax 61 3 8587 0499 info australia we ef com WE EF LIGHTING United States of America Tel 1 724 742 0030 Fax 1 724 742 0035 info usa we ef com TO9245W0719 WE ...

Page 10: ...WE EF LEUCHTEN Installation and Maintenance Instructions Planted Root ESV4 ESV2 ...

Page 11: ...0 0464 ESV4 300 0459 Suitability 1 KTX234 2 KTY234 AP 3 ZFY230 AP 4 GRY224 AP 5 Short post Suitability 1 XRY334 AP 2 XRZ334 3 RRY334 AP 4 RRZ334 Suitability 1 PSY414 424 Suitability 1 CFY259 2 GRY234 AP 3 RRY234 AP 4 RRZ324 5 XRY324 AP 6 XRZ234 Suitability 1 QSI254 ...

Page 12: ...4 1 2 3 4 5 Supply of ESV4 1 M8 x 40 4x 2 M8 x 25 4x 3 M8 Conical Washer 4x 4 Mounting Flange 5 ESV4 Planted Root 6 Conduit Entry Supply of ESV2 1 M12 x 30 2x 2 M12 Conical Washer 2x 3 Mounting Flange 4 ESV2 Planted Root 5 Conduit Entry ...

Page 13: ...as shown base plate is parallel to the pathway For this installation use 30 mm long M12 bolts supplied 2 Please note ESV4 must be orientated correctly for different products In both instances conduit entry can be rotated to match cable routing When the ESV is being installed for following products KTY234 KTX234 ZFY230 CFY259 please orientate the bolt pattern as shown base plate is 45 to the pathwa...

Page 14: ...7 Fit the nominated bolts through mounting ƃange Ensure several threads feed through the plate and tape off top and bottom Bolts are inserted to protect threads off plate and need to be removed for Ƃtting installation after setting the ESV 8 Pour concrete to desired level depending on requirement of soil paver or concrete Ensure that for any installation mounting ƃange must be ƃush or higher than ...

Page 15: ...6 9 After concrete has cured for speciƂed time remove blanking and bolts Install Ƃtting as per luminaire instructions onto mounting ƃange ...

Page 16: ...nfo switzerland we ef com WE EF LIGHTING United Kingdom Tel 44 844 880 5346 Fax 44 844 880 5347 info uk we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 info asiapaciƂc we ef com WE EF LIGHTING Australia Tel 61 3 8587 0444 Fax 61 3 8587 0499 info australia we ef com WE EF LIGHTING United States of America Tel 1 724 742 0030 Fax 1 724 742 0035 info usa we ef com TO9257W0219 WE ...

Reviews: