6) Pull cable 

D

 (and second cable for through wir-

ing, if required) through membrane spout(s) 

F

 

and terminate in terminal block 

G

. Lock cable(s) 

with strain relief(s).

7)  Return terminal box cover 

C

 and push until 

tab 

H

 engage with pins.

5)  Check that rating shown on luminaire label 

conforms with mains electrical supply.

 (example)

PSY424 

220-240V/50-60 Hz

114-XXXX SOE 

XXXXXXX

LED 4000K 18W  item no. XXX

08/18 IP66

8) Place sleeve

 A

 over post 

B

 with sticker

 I  

pointing up as shown.

Summary of Contents for PSY414 LED

Page 1: ... respective primary Type 1 and secondary Type 2 surge arrestors in compliance with EN61643 11 IEC61643 1 Warning Ensure that all required surge protection measures are in place and activated prior to luminaire installation Also disconnect luminaires before operating high power devices such as for example electrical arc welders Do not open during installation This product is factory sealed Refer to...

Page 2: ...4 16 1 for PTY414 14 0 for PTY424 19 0 Accessories Planted root Galvanised steel kg ESV2 for PSY414 424 300 9115 3 8 ESV2 for PTY414 424 300 9115 3 8 ESV2 Bollard PSY414 PSY424 PTY414 PTY424 190 180 75 304 800 100 90 ø 14 5 180 260 180 75 440 1000 100 90 ø 14 5 180 ...

Page 3: ...pecial maintenance work is required Do not use high pressure cleaners In case of component failure due to abnormal circumstances or at end of life replacement must be carried out E D VXLWDEO TXDOLƂHG DQG WUDLQHG SURIHVVLRQDO Warning Do not open luminaire while mains supply is switched on ...

Page 4: ...WKH OXPLQDLUH LV PRGLƂHG E DQ ERG RWKHU than the original manufacturer then the warranty will no longer be valid and shall become the full respon sibility of the modifying person organisation Claims based on defects attributable to improper installation and or application and the consequences thereof are excluded Attention The luminaire is factory sealed and does not need to be opened during insta...

Page 5: ...ical supply 4 Lift tab H and remove terminal box cover C as shown 2 Remove sleeve A from post B 3XOO FDEOH WKURXJK FHQWUH KROH DQG VFUHZ ƃDQJH plate E with M12 bolts nuts to ground Ensure proper orientation of terminal box An optional planted root is available Note Planted root installation instruction is available in additional document ...

Page 6: ...able s with strain relief s 7 Return terminal box cover C and push until tab H engage with pins 5 Check that rating shown on luminaire label conforms with mains electrical supply example PSY424 220 240V 50 60 Hz 114 XXXX SOE XXXXXXX LED 4000K 18W item no XXX 08 18 IP66 8 Place sleeve A over post B with sticker I pointing up as shown ...

Page 7: ...rom head K with Torx 25 tool supplied by WE EF 9 Align sleeve A LQWR ƃDQJH SODWH E good and bad engagement 12 Place head K over sleeve A and check for alignment ƃXVK 11 Hold head K under arm Grab socket L connect and tighten with plug M ...

Page 8: ...7 13 Tighten recessed screws N gradually in alternating sequence 6 Nm with Torx 30 tool supplied by WE EF 14 Return countersunk screws J into head and tighten ...

Page 9: ...nd Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFLƂF ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 Fax 61 3 8587 0499 info australia we ef com WE EF LIGHTING United States of America Tel 1 724 742 0030 Fax 1 724 742 0035 info usa we ef com TO9245W0520 WE EF 2020 7HFKQLFDO VSHFLƂFDWLRQV DUH subject ...

Page 10: ...WE EF LEUCHTEN Installation and Maintenance Instructions Planted Root ESV4 ESV2 ESV6 ...

Page 11: ...4 300 0586 ESV4 300 0464 ESV4 300 0459 Suitability 1 KTX234 2 KTY234 3 ZFY230 4 GRY224 5 Short post Suitability 1 XRY334 2 XRZ334 3 RRY334 4 RRZ334 Suitability 1 CFY259 2 GRY234 3 RRY324 4 RRZ324 5 XRY324 6 XRZ324 Suitability 1 QSI254 ...

Page 12: ...3 Planted Root ESV2 300 9115 ESV6 300 0824 ESV6 300 0457 Suitability 1 PSY414 424 Suitability 1 AML C 2 FLA461 Suitability 1 LTM440 2 LTM444 3 AMW C 4 AMF C 5 AMF S 6 AML C 240 200 600 ...

Page 13: ...late is parallel to the pathway For this installation use 30 mm long M12 bolts supplied 2 Please note ESV4 and ESV6 must be orientated correctly for different products In both instances conduit entry can be rotated to match cable routing When the ESV is being installed for following products KTY234 KTX234 ZFY230 CFY259 FLA461 please orientate the planted root as shown base plate is at an angle of ...

Page 14: ...ts supplie 7 Place the ESV in the form work for concrete pad ensuring orientation position and levels are correct Ensure all openings on ESV are blanked off including mounting plate hole 8 Fit the nominated bolts through mounting ƃDQJH QVXUH VHYHUDO WKUHDGV IHHG WKURXJK the plate and tape off top and bottom Bolts are inserted to protect threads off plate and need to EH UHPRYHG IRU ƂWWLQJ LQVWDOODW...

Page 15: ...paver or concrete Ensure WKDW IRU DQ LQVWDOODWLRQ PRXQWLQJ ƃDQJH PXVW EH ƃXVK RU KLJKHU WKDQ VXUURXQGLQJ VXUIDFH OHYHO IWHU FRQFUHWH KDV FXUHG IRU VSHFLƂHG WLPH UHPRYH EODQNLQJ DQG EROWV QVWDOO ƂWWLQJ as per luminaire instructions onto mounting ƃDQJH Concrete Paver Soil ...

Page 16: ...nd Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFLƂF ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 Fax 61 3 8587 0499 info australia we ef com WE EF LIGHTING United States of America Tel 1 724 742 0030 Fax 1 724 742 0035 info usa we ef com TO9257W0420 WE EF 2020 7HFKQLFDO VSHFLƂFDWLRQV DUH subject ...