background image

4

 6ZLWFKRĪPDLQVHOHFWULFDOVXSSO\

Installation Procedure 

2)  Pull the connecting cable through the pole. Place the luminaire on top of the pole and tighten 

fasteners B, tightening to a torque of 10 Nm.

Side entry

Post top

ø 40-60 x 100*

B

ø 76 x 100

B

Summary of Contents for LEUCHTEN AFL100 Series

Page 1: ...arrestors in compliance with EN61643 11 IEC61643 1 Warning Ensure that all required surge protection measures are in place and activated prior to luminaire installation Also disconnect luminaires bef...

Page 2: ...AFL120 AFL130 9 14 mm 1 2 5 mm2 602 37 65 191 5 653 37 65 191 5 683 111 733 111 250 89 300 89 Weight kg for AFL120 max 6 95 for AFL130 max 8 60 Windage area m2 for AFL120 max 0 146 for AFL130 max 0 1...

Page 3: ...th latest building construction and or electrical regulations and relevant legislation Warning 6ZLWFK R PDLQV HOHFWULFDO VXSSO SULRU WR LQVWDOOLQJ DQG FRQQHFWLQJ WKH OXPLQDLUH Caution Risk of electric...

Page 4: ...screws J For horizontal mounting attachment can be set at 0 2 5 5 7 5 10 12 5 and 15 Adaptor to be ordered separately Using adaptor K diameter can be reduced from 76 mm to 60 mm or 42 mm Attach adapt...

Page 5: ...WULFDO VXSSO Installation Procedure 2 Pull the connecting cable through the pole Place the luminaire on top of the pole and tighten fasteners B tightening to a torque of 10 Nm Side entry Post top 40 6...

Page 6: ...e a ON OFF L Phase N Neutral Earthing b BASIC L1 Phase 1 L2 Phase 2 N Neutral Earthing c DALI L Phase N Neutral Earthing DA DA DALI control line E 60 x 100 adaptor K is required 4 Table of maximum tem...

Page 7: ...d Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 info asiapacific we ef com WE EF LIGHTING Australia Tel 61 3 8587 0444...

Reviews: