background image

3

Installation

The product must be installed and maintained by a 

suitably quali

Ƃ

ed professional in compliance with latest 

building/construction and/or electrical regulations and 

relevant legislation.

Warning:

 Switch off mains electrical supply prior to 

installing and connecting the luminaire.

Notice:

 If the luminaire is modi

Ƃ

ed by anybody other 

than the original manufacturer, then the warranty will 

no longer be valid and shall become the full respon-

sibility of the modifying person/organisation. Claims 

based on defects attributable to improper installation 

and/or application, and the consequences thereof, are 

excluded.

Attention:

 The housing 

L

 containing the LED light 

source is factory-sealed and does not need to be 

opened during installation.

Installation Procedure

1)  Switch off mains electrical supply.

2) Remove mounting 

ƃ

ange 

A

 by loosening screws 

B

Detach terminal connector 

C

.

3)  Determine position for 

Ƃ

xing screws 

D

.  

Drill relevant holes 

E

 and insert wall plugs 

F

.

 

Warning

: Ensure not to damage any electric cable, 

water pipe or other devices while drilling holes.

4)  Feed mains supply cable 

G

 through the pressure 

screw 

I

, while setting mounting 

ƃ

ange 

A

 in posi-

tion. The pre-installed packing ring 

H

 is suitable 

for cable diameters 7 to 9.5 mm. For larger cable 

diameters (9 to 12 mm) use the auxiliary packing 

ring supplied. Then tighten the pressure screw 

I

 

(Fig. I).

5) To 

Ƃ

x mounting 

ƃ

ange 

A

, pierce through nylon 

plugs 

P

 by inserting and tightening screws 

D

.

 

Attention

: Nylon plugs 

P

 must remain in position 

to provide sealing.

6)  Check that rating shown on luminaire label conforms 

with mains electrical supply.

7)  Connect mains supply cable 

G

 leads to respective  

terminals in terminal connector 

C

a) ON/OFF (L = Phase, N = Neutral,   = Earthing) 

b) 1-10 V/DALI (L = Phase, N = Neutral, 

 = Earthing, DA/DA = DALI control line, 

D–/D+ = 1-10 V control line).

8)  Ensure that all surfaces are clean and dry. Position 

luminaire over mounting 

ƃ

ange 

A

 and attach termi-

nal connector 

C

. Tighten screws 

B

.

9) Loosen screws 

M

 and 

N

 slightly. Aim luminaire 

in desired direction, retighten screws 

M

 and 

N

.

Reviews: