![WE-EF FLC301 Installation And Maintenance Manual Download Page 11](http://html2.mh-extra.com/html/we-ef/flc301/flc301_installation-and-maintenance-manual_4013899011.webp)
2
Installation
The product must be installed and maintained by a
VXLWDEO\TXDOLƂHGSURIHVVLRQDOLQFRPSOLDQFHZLWK
latest building/construction and/or electrical
regulations and relevant legislation.
The EM1-2 short post can be mounted either to a
planted root or to an anchor bolt assembly secured
in a cast concrete foundation. It is assumed that
the mounting option chosen has been designed and
constructed to satisfy prevailing load, location and
soil type conditions, and is ready to receive the EM1-2
short post.
Warning:
6ZLWFKRIIPDLQVHOHFWULFDOVXSSO\SULRUWR
installing and connecting the luminaire.
Notice:
,IWKHOXPLQDLUHLVPRGLƂHGE\DQ\ERG\RWKHU
WKDQWKHRULJLQDOPDQXIDFWXUHUWKHQWKHZDUUDQW\ZLOO
no longer be valid and shall become the full
responsibility of the modifying person/organisation.
Claims based on defects attributable to improper
installation and/or application, and the consequences
thereof, are excluded.
7KHLQVWDOODWLRQRQVLWHPXVWFRPSO\ZLWKORFDODQGRU
national health and safety regulations.
Installation Procedure
1) Ensure mounting surface
A
is clean and free of
debris.
2) Ensure anchor bolts
C
suit hole pattern in short
SRVWpVƃDQJHSODWH
E
and feature appropriate,
levelled protrusion from surface
A
.
3) Place rubber patch
I
on mounting surface
A
.
4) Mount short post
B
. Adjust nuts
D
DQGZDVKHUV
H
on anchor bolts
C
and ensure the short post
B
is
perpendicular to the ground.
5) Secure cover
F
E\WLJKWHQLQJFRYHUVFUHZV
G
to the
ƃDQJHSODWH