6
6ZLWFKRĪPDLQVHOHFWULFDOVXSSO\
10) Terminate cable E and mains supply cable O in
sealable junction box J and connect leads to
respective terminals:
a) ON/OFF or wireless (L = Phase, N = Neutral,
= Earthing)
b) 0-10 V (L = Phase, N = Neutral,
= Earthing, D–/D+ = 0-10 V control line).
c) DMX: refer to separate wiring instruction for
DMX cable. Please refer to instruction inside
SJB packaging.
For wallwash illumination only
Ensure the arrow indicated on the sticker is
facing the illuminated surface.
Phase Two
Luminaire Installation and Electrical Connection
9) Check that rating shown on luminaire label
conforms with mains electrical supply.
(example)
ETC330-FS
120-277V/60/Hz, 0-10V
185-XXXX
SOE XXXXXXX
LED 4000K 12W item no. XXX
03/17 IP67