background image

WE-EF LEUCHTEN

Installation and Maintenance

Instructions

Inground Luminaire

ETC320-GB LED

Surge Protection

This product has a built in level of surge protection. For comprehensive  

protection of a luminaire installation against lightning and electrical surges,  

it is essential to cover mains supply and data input lines at the distribution  

board level, by using respective primary (Type 1) and secondary (Type 2)  

surge arrestors in compliance with EN61643-11/IEC61643-1.

Warning

Ensure that all required surge protection measures are in place and  

activated prior to luminaire installation. Also, disconnect luminaires before  

operating high-power devices such as, for example, electrical arc welders.

INSTALLER  

HOTLINE

+61 458 933399

7am

7pm AEST

Do not handle the luminaire by holding 
the cable end!

Refer to the instructions contained in this  
document for details.

Summary of Contents for ETC320-GBLED

Page 1: ...istribution board level by using respective primary Type 1 and secondary Type 2 surge arrestors in compliance with EN61643 11 IEC61643 1 Warning Ensure that all required surge protection measures are...

Page 2: ......

Page 3: ...Inground Luminaire IP67 Class I ta 25 C Y 1 X W Fig I...

Page 4: ...using a standard tool in the direction of the open mark until the gimbal module can be pulled out of the luminaire housing b Detach terminal connector Y and remove gimbal module X c Properly package g...

Page 5: ...n the original manufacturer then the warranty will no longer be valid and shall become the full respon sibility of the modifying person organisation Claims based on defects attributable to improper in...

Page 6: ...the object to be illuminated wall tree column b Mounting ring H is flush with surface F If the floor will be tiled or paved afterwards leave an appropriate gap c Mains supply cable s O is of sufficien...

Page 7: ...emove screws M from mounting ring H 7 Terminate cable N from luminaire C and mains sup ply cable O for individual wiring or branch cable for through wiring in sealable junction box J to connect cable...

Page 8: ...R M J O N O D A B C H F L 6...

Page 9: ...Fig V G T W E U Fig IV J H M C N L F 7...

Page 10: ...t please contact WE EF The desiccant sachet MUST not be left in the open environment please seal luminaire down within 15 minutes of opening sachet 2 Loosen and remove heatsink assembly 3 Open Desicca...

Page 11: ...n Inserting Desiccant sachet into ETC gimbal 5 Aim gimbal and tighten 6 Place lens back onto housing noting alignment of indexing stud 7 Tighten cover down to recommended torque in criss cross pattern...

Page 12: ...rland Tel 41 22 752 49 94 Fax 41 22 752 4974 info switzerland we ef com WE EF LIGHTING United Kingdom Tel 44 844 880 5346 Fax 44 844 880 5347 info uk we ef com WE EF LIGHTING Thailand Tel 66 2 738 961...

Reviews: