WE-EF ESC100 LED Series Installation And Maintenance Instructions Download Page 3

Installation Methods 
Installation with BET 

Ensure that proper drainage is provided for the shown 
installation methods. 
1)  In landscaped areas (soil with gravel base), 

pic. 1

2)  In paved areas (concrete with gravel base),

 pic. 2

pic. 1

pic. 2

pic. 3

pic. 4

pic. 5

pic. 6

gravel (drainage)

concrete

soil

Phase Two 

(Electrical connection, aiming)

4)  Switch off mains electrical supply. 

5)  Check that rating shown on luminaire label conforms 

with the mains electrical supply. Observe the maxi-
mum permissible wattage in connection with BET 
installation blockouts (refer to table “Installation 
Accessories”).

 

6)  Loosen screws 

K

 and remove cover 

B

. Remove 

cover 

G

 and lens/gasket assembly 

H/I 

by removing 

the six countersunk screws 

J

.

 
Installation without BET

3)  In landscaped areas (soil with gravel), 

pic. 3

4)  In landscaped areas (soil with concrete and graval 

base), 

pic. 4

5)  In paved areas (concrete), 

pic. 5

6)  In paved areas (concrete with gravel base) see 

pic. 6

Installation with Blockout BET 
Phase One 

(During earth or masonry works)

1)  Put the mounting ring 

E

 on to the installation 

blockout 

O

 in that way, that the connector 

lock 

into position on the blind rivets 

S

.

2)  A suitable recess to be provided to accomodate  

installation blockout/mounting ring assembly 

E/O

Proceed as follows:

a)  Set in position together with supply cable(s) 

P

.

 

 

b)  Luminaire mounting ring 

E

 to be flush with surface 

F

 (if the floor will be tiled or paved afterwards 

leave an appropriate gap).

c)  Point arrow 

R

 towards the object (wall, tree, 

column ...) to be illuminated.

3)  During ongoing earth and/or masonry works, ensure 

that installation blockout/mounting ring assembly 

E/O

 is not damaged and maintains its original 

shape. If necessary use a cover plate.

7)  Remove the chassis M from the luminaire housing 

N

.

8)  Ensure that all surfaces are clean and dry. Then 

remove gel bag from aluminium envelope. Place 
bag inside the bottom of the luminaire 

N

.

9)  Remove the two screws 

Q

 from mounting ring 

E

Open the packaging of the desiccant bag. Place 
the bag in the lower part of the luminaire housing.

10) Connect wires of luminaire cable 

A

 and mains 

supply cable 

P

 in sealable junction box 

C

 (e.g. 

WE-EF product no. 185-1624) and/or provided 
UL410-D wire nuts. Seal junction box properly.

11) Insert the housing into the blockout. Fix mounting 

ring 

E

 to luminaire by inserting two stainless screws 

Q

 and tightening them equally.

12) Assemble in reverse order.

13) Set lens/gasket assembly 

H/I

, cover 

G

 and the six 

counter sunk  screws 

J

 in position as described. 

Then, while taking all necessary precautions to 
ensure safety:

a)  Leave the screws untightened and ignite the lumin-

aire for approx. 30 minutes to allow any moisture 
to evaporate.

b)  Begin tightening the countersunk screws 

J

 in steps 

in a criss-cross pattern, until all six screws are pro-
perly seated and secured. Repeat tightening proce-
dure, again in a criss-cross pattern, for another two 
rounds with a torque of 9 Nm.

14) Set luminaire in position while observing to avoid 

stress on junction box 

C

, cable 

A

 and cable gland 

D

.

15) Reposition cover 

B

 and tighten screws 

K

.

Reviews: