
Installation Methods
Installation with BET
Ensure that proper drainage is provided for the shown
installation methods.
1) In landscaped areas (soil with gravel base),
pic. 1
2) In paved areas (concrete with gravel base),
pic. 2
pic. 1
pic. 2
pic. 3
pic. 4
pic. 5
pic. 6
gravel (drainage)
concrete
soil
Phase Two
(Electrical connection, aiming)
4) Switch off mains electrical supply.
5) Check that rating shown on luminaire label conforms
with the mains electrical supply. Observe the maxi-
mum permissible wattage in connection with BET
installation blockouts (refer to table “Installation
Accessories”).
6) Loosen screws
K
and remove cover
B
. Remove
cover
G
and lens/gasket assembly
H/I
by removing
the six countersunk screws
J
.
Installation without BET
3) In landscaped areas (soil with gravel),
pic. 3
4) In landscaped areas (soil with concrete and graval
base),
pic. 4
5) In paved areas (concrete),
pic. 5
6) In paved areas (concrete with gravel base) see
pic. 6
Installation with Blockout BET
Phase One
(During earth or masonry works)
1) Put the mounting ring
E
on to the installation
blockout
O
in that way, that the connector
L
lock
into position on the blind rivets
S
.
2) A suitable recess to be provided to accomodate
installation blockout/mounting ring assembly
E/O
.
Proceed as follows:
a) Set in position together with supply cable(s)
P
.
b) Luminaire mounting ring
E
to be flush with surface
F
(if the floor will be tiled or paved afterwards
leave an appropriate gap).
c) Point arrow
R
towards the object (wall, tree,
column ...) to be illuminated.
3) During ongoing earth and/or masonry works, ensure
that installation blockout/mounting ring assembly
E/O
is not damaged and maintains its original
shape. If necessary use a cover plate.
7) Remove the chassis M from the luminaire housing
N
.
8) Ensure that all surfaces are clean and dry. Then
remove gel bag from aluminium envelope. Place
bag inside the bottom of the luminaire
N
.
9) Remove the two screws
Q
from mounting ring
E
.
Open the packaging of the desiccant bag. Place
the bag in the lower part of the luminaire housing.
10) Connect wires of luminaire cable
A
and mains
supply cable
P
in sealable junction box
C
(e.g.
WE-EF product no. 185-1624) and/or provided
UL410-D wire nuts. Seal junction box properly.
11) Insert the housing into the blockout. Fix mounting
ring
E
to luminaire by inserting two stainless screws
Q
and tightening them equally.
12) Assemble in reverse order.
13) Set lens/gasket assembly
H/I
, cover
G
and the six
counter sunk screws
J
in position as described.
Then, while taking all necessary precautions to
ensure safety:
a) Leave the screws untightened and ignite the lumin-
aire for approx. 30 minutes to allow any moisture
to evaporate.
b) Begin tightening the countersunk screws
J
in steps
in a criss-cross pattern, until all six screws are pro-
perly seated and secured. Repeat tightening proce-
dure, again in a criss-cross pattern, for another two
rounds with a torque of 9 Nm.
14) Set luminaire in position while observing to avoid
stress on junction box
C
, cable
A
and cable gland
D
.
15) Reposition cover
B
and tighten screws
K
.