22
TANK INSTALLATION
Excavating the correct size trench
A square stepped excavation may be used due to the physical shape of the WPL
Diamond plant. Allow adequate clearance for all pipes and any other connections
to the unit.
Do not attempt to lift the treatment tank when filled with water.
Backfilling instructions
The tank should be backfilled as per the installation diagram. Regular checks must
be performed during backfilling to ensure the tank remains level.
Contd.
300mm
300mm
DMS MODELS - 300mm
DMC MODELS - 450mm
ALLOW DEPTH FOR
INVERT EXTENSIONS