Expandable track
●
Others
Pivot between boom and arm; pivot of arm cylinder plunger; pivot at
base of bucket cylinder.
2. Slewing bearing - every 250h
1. Park machine on the flat ground.
2. Lower the bucket onto ground.
3. Idle engine at low speed for 5min.
4. Turn the ignition switch to OFF and then take off thekey.
5. With the upper-structure standing still, add the grease into the two grease nipples.
6. Start up engine to lift the bucket free from the ground, and then swing the upper-structure by 45 degree (1/8
cycle).
7. Lower the bucket onto ground.
3. External meshing gear 45 of slewing bearing ---- every 500h
Summary of Contents for CTX8010C
Page 1: ...1 CTX8010C MINI EXCAVATOR OPERATION PARTS MANUAL...
Page 4: ...4 Quick hitch Narrow bucket Log grab Mechanical thumb Auger Ripper Rake...
Page 5: ...5 Section II Main performance parameters...
Page 13: ...12 Main pump...
Page 15: ...14 Section IV Schematics of main valve...
Page 16: ...15 Section V Electrical system diagram...
Page 21: ...20...
Page 35: ...31 22 Lower the bucket onto the ground 23 Turn off the engine Unplug the ignitionkey...
Page 54: ...48...
Page 55: ...49...
Page 56: ...50...
Page 57: ...51...
Page 58: ...52...
Page 59: ...53...
Page 60: ...54...
Page 61: ...55...
Page 62: ...56...
Page 63: ...57...
Page 64: ...58...
Page 65: ...59...
Page 66: ...60...
Page 67: ...61...
Page 68: ...62...
Page 69: ...63...