EuroHEK

 Sand and Sludge Trap 

16AI01ae 

 

WAVIN-LABKO LTD 

 

4.

 

Compact the sand layer around the sand and sludge trap with extreme care. Keep 
compacting the sand bed around the  sand and sludge trap in 20 cm layers. While 
this work is being done, keep adding water to the tank to keep it steady. 

5.

 

If the system is to be equipped with a EuroNOK sampling shaft including a shut-off 
valve, see separate installation instructions for the sampling and shut-off valve shaft 
EuroNOK as well as the instructions laminated onto the side of the shaft. 

6.

 

Install the inlets and outlets of the sand and sludge trap. 

7.

 

Install rubber gaskets onto the bottom edge of the maintenance shaft(s). Install the 
EuroHUK maintenance shaft in a vertical position into the installation frame of the 
sand and sludge trap. Lock the retaining latches (see figure 5). 

If required, attach the RP-maintenance shafts (LM-HUKs) into their installation 
frames. Do not let the gaskets slip off their grooves. Certain lubricants contribute to 
an easier installation of the RP- maintenance shafts. 

8.

 

Install the ventilation tubes onto the ventilation outlets on the maintenance shafts. 

9.

 

Install the sludge alarm probe of the SandSET 101  into the sand and sludge trap 
(comes as a standard in models 10000-50000,  an accessory in other models ).  The 
connection box is hung on the metal hook on the  upper edge of the maintenance 
shaft.  After this, determining the preferred height of the probe is possible; 
recommendation is 1/3 of the tank volume. For further information, see figure 4. 

 

D (inner diameter) 

A (collar/probe ) 

B (bottom/probe) 

1600 mm 

1290 mm 

540 mm 

2200 mm 

1670 mm 

760 mm 

3000 mm 

2200 mm 

1035 mm 

Figure 4. SandSET 101 probe cable length for sand and sludge traps Ø 1600-3000 mm 

10.

 

Install the cable protection tube into the cable penetration at the top of the 
maintenance shaft. The probe cable should be pulled into the building through the 
cable protection tube. Leave enough cable inside the maintenance shaft to lift the 
probe on the ground surface for maintenance operations. 

Summary of Contents for EuroHEK

Page 1: ...i WAVIN LABKO LTD Labkotie 1 FIN 36240 KANGASALA Tel 358 20 1285 270 Fax 358 20 1285 280 E mail tanks wavin labko fi 02 04 16AI01ae EuroHEK Sand and Sludge Trap Instructions for Installation Operation...

Page 2: ...TECHNICAL DATA 3 2 1 OPERATION 3 2 2 SYSTEM COMPONENTS 4 2 3 ACCESSORIES 6 2 3 1 Anchoring belts 6 2 3 2 Maintenance shaft 6 2 3 3 Cast iron cover and frame 6 2 3 4 SandSET 101 sludge alarm 6 2 3 5 D...

Page 3: ...rap must be inspected for any damage that might have occurred during the transport The maximum installation depth of the EuroHEK sand and sludge trap from ground level to the lower edge of the input s...

Page 4: ...d inlet sewer mm 870 870 1410 C Skid outlet sewer mm 850 850 1340 D Diameter mm 1000 1400 1400 E Ventilation by order PVC 110 110 110 F Cast iron cover frame D 600 accessory G SandSET sludge alarm acc...

Page 5: ...Weight excluding the cover frame kg 145 190 197 318 396 513 G Cast iron cover frame D 600 accessory EuroHEK 10000 50000 sand and sludge trap 10000 13000 15000 16000 20000 30000 40000 50000 A Inlet Ou...

Page 6: ...f ratchets In this case also the nominal capacity of the belt should be higher tank diameter 1 4 2 2 m easy corrosion environments nominal capacity 4000 kg electroplated zinc coated ratchets and hooks...

Page 7: ...ge trap 2 Compact a 30 cm levelled stone free sand layer on the bottom of the pit 3 If necessary cast an anchoring slab or slabs on the sand layer inserting a necessary amount of RST lugs of min diame...

Page 8: ...g in metres If the amount of anchoring belts is insufficient or the belts are not tight enough the buoyant force of the water in the soil can lift the sand and sludge trap up to surface later on when...

Page 9: ...s Do not let the gaskets slip off their grooves Certain lubricants contribute to an easier installation of the RP maintenance shafts 8 Install the ventilation tubes onto the ventilation outlets on the...

Page 10: ...tion plate and the asphalt layer laid on the ground surface 14 In an area of heavy and medium weight traffic a load compensation plate and a layer of asphalt must be laid to equalize the wheel loads S...

Page 11: ...ld be completely emptied at least every second year When doing this clean the dirt from the walls with tap water or by high pressure washing Check also the condition of the sand and sludge trap Right...

Reviews: