STEP 4

Slowly open downstream isolation valve to establish flow through 
the system.

Note: Reducing Control is set higher than the Sustaining Control

STEP 5

Open downstream isolation valve partially to establish flow 

through the valve, observing downstream pressure change. If 

downstream pressure is outside the desired pressure range, 

turn the Reducing Control adjustment screw IN, clockwise, to 

increase or OUT, counterclockwise, to decrease until pressure is 

near the desired setting (See Figure 2).

STEP 6

Gradually open downstream isolation valve until fully open

.

STEP 7

Fine-tune the Reducing Control adjustment to the pressure 

reducing set point, as detailed in Step 5.

Counterclockwise to INCREASE 

the rate of opening

Clockwise to DECREASE the 

rate of opening

Step 8

Opening Speed Flow Control Adjustment: The Opening speed 

flow control allows free flow into the cover and restricted flow out 

of the cover of the main valve. If recovery of pressure is slow upon 

increased downstream demand, turn the adjustment screw OUT, 

counterclockwise, increasing the rate of opening. IF recovery 

of downstream pressure is too quick, as indicated in a rapid 

increase in pressure, possibly higher than the desired set-point, 

turn the adjustment screw IN, clockwise, decreasing the rate of 

opening (See Figure 3).

Step 9

(If the main valve comes equipped with a Closing Speed Control, 

otherwise ignore this step.)
Closing Speed Needle Valve Adjustment: The closing speed 

needle valve regulates fluid pressure into the main valve cover 

chamber, controlling the valve closing speed. If the downstream 

pressure fluctuates slightly above the desired set point, turn the 

adjustment screw OUT, counterclockwise, increasing the rate of 

closing.

Figure 3 

Flow Control

Counterclockwise to DECREASE 

downstream pressure

Clockwise to INCREASE 

downstream pressure

Figure 2 

CP15 — Pressure Reducing Control

4          IOM-A-ACV-912_612   2115 

EDP# 1917034 

© 2021 Watts

IOM-A-ACV-912_612   2115 

EDP# 11917034 

© 2021 Watts         5

Summary of Contents for Ames 612GD

Page 1: ...2 Setting the Pressure Reducing Control 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions...

Page 2: ...ion flush line to remove debris 2 Install valve so the flow arrow matches flow through the line and gauges to monitor valve inlet and outlet pressures A Position Indicator can be installed to provide...

Page 3: ...e does not include a bleed valve bleed air by loosen ing a fitting on the valve or a plug at the highest point of the valve assembly STEP 3 Pressure the line by opening the upstream isolation valve sl...

Page 4: ...into the cover and restricted flow out of the cover of the main valve If recovery of pressure is slow upon increased downstream demand turn the adjustment screw OUT counterclockwise increasing the rat...

Page 5: ...ief Sustaining Control screw IN clockwise until the inlet pressure begins to increase or OUT counterclockwise to decrease stopping at the desired pressure See Figure 4 Step 4 Allow pressure to stabili...

Page 6: ...ve specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphr...

Page 7: ...embly by partially opening from full closed position Improperly configured opening speed control if equipped Adjust opening speed control to verify functionality adjust as required Standard setting fo...

Page 8: ...Remove cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may requi...

Page 9: ...e brush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thr...

Page 10: ...Nuts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integ...

Page 11: ...Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 13...

Page 12: ...sts resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no c...

Reviews: