SmartPlate Installation, Operation & Maintenance Manual
CHAPTER 2
– INSTALLATION
OMM-0069_0H
• SP-100 • 1/30/2020 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
22
of
134
ADDITIONAL COMPONENT INSTALLATION Instructions
2. If you have a 200 PSI unit, install the parts as shown in Figure 2-10.
Figure 2-10. Relief Valve and Air Vent Valve Installation
– 200 PSI – Exploded
3. If the unit is being installed in New York City only (kits
58128-3
–
58128-6
), in addition to
the steps above you must install a second Relief Valve (P/N
92111
) in the Boiler Water
Intake Ball Valve/Strain combo, as shown in Figure 2-11. If the unit has 2 inch piping
(models SP-42, SP-61 or SP-
113), you must include the 1” to ¾” bushing (P/N
93505
).
Units with 1 ½” piping do not need this bushing.
Figure 2-11. Relief Valve Installation
– New York City Option
Relief Valve
P/N
92134-1
Bushing, 1 ½” to ¾”
P/N
93521
Air Vent Valve
P/N
92130
Nipple, ¾”
P/N
93451
Bushing, 1” to ¾”
P/N
93505
Bushing, 1” to ¾”
(2” Piping Only)
P/N
93505
Relief Valve
P/N
92111
Intake Mixing
Box
BOILER WATER
INLET
NOTE:
Rotate the Relief Valve so that the
outlet connection to the drain hose does
not interfere with other components
Relief Valve Outlet