CHAPTER 3. OPERATION
3.1 INTRODUCTION
The information in this Chapter provides a guide to the operation of the Innovation Hot Water
Boiler using the Control Panel mounted on the front of the unit. It is imperative that the initial
startup of this unit be performed by factory trained personnel. Operation prior to initial startup
by factory trained personnel will void the equipment warranty. In addition, the following
WARNINGS and CAUTIONS must be observed at all times.
--CAUTION -
All of the installation procedures in Chapter 2 must be completed before
attempting to start the unit.
--WARNING! -
ELECTRICAL VOLTAGES IN THIS SYSTEM INCLUDE 220, 110 AND 24
VOLTS AC. IT MUST BE SERVICED ONLY BY FACTORY CERTIFIED
SERVICE TECHNICIANS.
--WARNING! -
DO NOT ATTEMPT TO DRY FIRE THE UNIT.
STARTING THE UNIT
WITHOUT A FULL WATER LEVEL CAN SERIOUSLY DAMAGE THE
UNIT AND MAY RESULT IN INJURY TO PERSONNEL OR PROPERTY
DAMAGE. THIS SITUATION WILL VOID ANY WARRANTY.
3.2 CONTROL PANEL DESCRIPTION
The Innovation Control Panel shown in Figure 3-1 contains all of the controls, indicators and
displays necessary to operate, adjust and troubleshoot the Innovation Hot Water Boiler. These
operating controls, indicators and displays are listed and described in Table 3-1. Additional
information on these items is provided in the individual operating procedures provided in this
Chapter.