
Benchmark 750-3000 Boiler Operation & Maintenance Manual
APPENDIX D – RECOMMENDED PERIODIC TESTING
OMM-0122_D
•
GF-206
•
5/9/2019
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 92 of 164
Recommended Periodic Testing
ITEM
FREQUENCY
ACTION BY
REMARKS
Operating controls
Annually
Operator
See section 2.2.
Low air flow
Monthly
Operator
See section 5.8 in the
Benchmark 750 – 3000
Installation and Startup Guide
, OMM-0121
(GF-205).
High and low gas
pressure interlocks
Monthly
Operator
See sections 5.2 and 5.3 in the
Benchmark
750 – 3000 Installation and Startup Guide
,
OMM-0121 (GF-205).
Air/Fuel Valve purge
position switch
Annually
Service Technician
See section 5.10 in the
Benchmark 750 –
3000 Installation and Startup Guide
, OMM-
0121 (GF-205).
Air/Fuel Valve
ignition position
switch
Annually
Service Technician
See section 5.11 in the
Benchmark 750 –
3000 Installation and Startup Guide
, OMM-
0121 (GF-205).
Safety valves
As required
Operator
Check per A.S.M.E. Boiler and Pressure
Vessel Code, Section IV.
Inspect burner
components
Semi-Annually
Service Technician
See section 4.6.
Condensate Trap
Semi-
Annually
Operator
See section 4.7.
Oxygen (O
2
) Level
Monthly
Operator
Verify oxygen level is between 3% and 8%
during boiler operation.