B-12 External Connections
Connecting to the nitrogen gas supply
Required materials
•
Chemical-resistant, powder-free gloves
•
Sharp knife
•
Wrench
•
6-mm PTFE tubing (included in the Waters Rough Pump Connect Kit)
•
Nitrogen regulator
To connect the nitrogen gas supply:
1. Use the sharp knife to cut a 3.8-cm to 5.0-cm (1.5-inch to 2-inch) length
of 6-mm PTFE tubing.
2. Connect this piece of tubing to one end of the nitrogen supply in-line
filter.
3. Connect the remaining length of the 6-mm PTFE tubing to the other end
of the filter.
4. Connect the free end of the short piece of 6-mm PTFE tubing to the
nitrogen inlet port on the rear of the instrument.
Caution:
To avoid gas leaks, use the sharp knife to cut the PTFE tubing
squarely (that is, perpendicular to its horizontal axis).
Summary of Contents for Xevo TQD
Page 12: ...xii...
Page 20: ...xx Table of Contents...
Page 23: ...Uses and compatibility 1 3 Xevo TQD TP03406...
Page 24: ...1 4 Specifications and Operating Modes Xevo TQD with visor up TP03407...
Page 42: ...1 22 Specifications and Operating Modes...
Page 52: ...2 10 Preparing for Operation...
Page 76: ...3 24 Changing the Mode of Operation...
Page 194: ...4 118 Maintenance Procedures...
Page 208: ...A 14 Safety Advisories...
Page 234: ...B 26 External Connections...
Page 238: ...C 4 Materials of Construction and Compliant Solvents...
Page 250: ...Index 8...