4-80
Maintenance Procedures
Tip:
The PEEK union used with the IonSABRE II probe is notched on
one of its flats, a feature that distinguishes it from the PEEK union used
with the ESI probe (see “Replacing the ESI probe sample capillary” on
).
7. Use the 7-mm wrench to loosen the locknut.
8. Unscrew the finger-tight PEEK union from the UNF coupling.
9. Remove the ferrule from the capillary.
10. Remove the capillary from the UNF coupling.
11. Dispose of the capillary and ferrule in accordance with local
environmental regulations.
Installing the new capillary
Required materials
•
Chemical-resistant, powder-free gloves
Warning:
The capillary and ferrule can be contaminated
with biohazardous and/or toxic materials. Dispose of them
according to local environmental regulations.
PEEK union/UNF coupling assembly
Capillary
Locknut
Notch
Ferrule
Summary of Contents for Xevo TQD
Page 12: ...xii...
Page 20: ...xx Table of Contents...
Page 23: ...Uses and compatibility 1 3 Xevo TQD TP03406...
Page 24: ...1 4 Specifications and Operating Modes Xevo TQD with visor up TP03407...
Page 42: ...1 22 Specifications and Operating Modes...
Page 52: ...2 10 Preparing for Operation...
Page 76: ...3 24 Changing the Mode of Operation...
Page 194: ...4 118 Maintenance Procedures...
Page 208: ...A 14 Safety Advisories...
Page 234: ...B 26 External Connections...
Page 238: ...C 4 Materials of Construction and Compliant Solvents...
Page 250: ...Index 8...