
4
STEP 5
Remove the JCN Nuts and JCB Bolts attaching the tank assembly to the rails at (i) & (ii).
Remove the tank assembly from the rails. DO NOT disassemble the forward riser or top deck
from the tank.
JCN Nut
(x4)
JCB Bolt
(x4)
(i)
(ii)
Allen Key(s)
STEP 4
Unscrew and remove the Handle Rests (i). Remove the footboard. It may be necessary
to slightly loosen the two bolts on the Top Deck (ii) to remove the footboard. DO NOT
COMPLETELY REMOVE THE TOP DECK BOLTS
Handle Rests
Handle Rest Bolt
(x2)
(ii)
(i)
Allen Key
Top Deck Bolts
Handle Rests
(x2)