12
Rails
Extending Rails
(If not extending, skip this section)
•
Insert the rail joiner into the side channel of one rail and tighten with half the joiner
exposed.
•
Slide the second rail onto the joiner and tighten
Note: rail joiner may be longer than the one shown.
Attaching rails top and bottom
Insert M8 bolts (heads) into the bottom channel of the rail and slide to the centre.
Adjust the bolts to line up with the 4 holes in the bracket at the end of the beam then insert bolts
and fasten with nuts and washers, ensure the mid- point of the rail is centre to the beam.