12
Rails
Sub Frame
Place the 3x sub frame rails (2600mm) across the flanges on the Beam, ensure the mid- point of the
rail is centre to the beam.
Lightly fasten the brackets with M8 bolts, leaving loose at first, then tightening once all 3 are square.