GENERAL
INSTALLATION
&
SERVICE
CAUTIONS
The control valve, fittings, and/or bypass are designed to accommodate minor plumbing misalignments they are not de-
signed to support the weight of a system or the plumbing.
Do
not
use
Vaseline,
oils,
other
hydrocarbon
lubricants,
or
silicone
spray
anywhere.
Do
not
use
silicone
on
red
or
clear
lip
seals.
Do
not
use
pipe
dope
or
other
sealant
on
threads.
Te
fl
on
tape
must
be
used
on
the
threads
of
the
1"
NPT
elbow,
its
¼"
NPT
connec ons,
and
on
the
threads
for
the
drain
line
connec on.
Te
fl
on
tape
is
not
used
on
the
nut
connec ons
or
caps
because
o
‐
ring
seals
are
used.
The
nuts
and
caps
are
designed
to
be
unscrewed
or
ghtened
by
hand
or
with
the
special
plas c
Service
Wrench,
CLV
‐
V3193(models
with
Clack
control
valves).
If
necessary,
pliers
can
be
used
to
unscrew
the
nut
or
cap.
Do
not
use
a
pipe
wrench
to
ghten
nuts
or
caps.
Do
not
place
screwdriver
in
slots,
on
caps,
and/or
tap
with
a
hammer.
SITE
REQUIREMENTS
‐
Water
Pressure,
20
‐
125
psi
‐
Current
draw
is
0.25
amperes
‐
Water
Temperature,
40º
‐
110º
F
‐
A
15
.
power
cord
is
furnished
‐
The
tank
should
be
on
a
fi
rm
level
surface
‐
The
plug
‐
in
transformer
is
for
dry
loca ons
‐
Electrical:
Use
a
115/120V,
60Hz
uninterrupted
only.
outlet.
‐
Ba eries
are
not
used.