10
•From the top of the counter place the stud,
tubing and Water Quality Monitor Connector
Cable through the mounting hole. See
Figure 2B, page 9.
•From the bottom of the counter top slide the
Slotted Washer between the counter top
and the Plastic Spacer with the open end
towards the tubing.
Tighten the
7
/
16
" Hex Nut to hold everything
in place.
•Rotate the Spout and Body into position
making sure the faucet body is square and
properly aligned with the Water Quality
Monitor Faucet Base. Align the Slotted
Washer and the Spacer to allow access to
the Hose Barbs, and tighten the Hex Nut
while holding the faucet in alignment with
a padded crescent wrench. Do not over
tighten.
•To the end of the
7
/
16
" stud, screw on the
3
/
8
" Polytube Quick Connect Fitting. Once
snug by hand take a pair of pliers and
tighten the fi tting an additional half turn.
Don’t over tighten.
Locate the
3
/
8
" Blue Product Water Tubing.
Firmly press one end into the
3
/
8
" Polytube
Quick Connect Fitting.
Note:
If you want to pull the tubing out for
some reason, push the ring around the
tubing in and pull the tubing out.
B. Feed Water Saddle Valve Installation
Decide on location. Do NOT connect to a
hot water feed line. If you are not sure of the
supply, run the hot water and feel the supply
piping. Wa ter over 100°F may cause permanent
dam age to the R.O. Membrane. (Refer to Fig. 3
page 11.)
1. Shut off the water supply and drain the line.
2a. To install on (soft) Copper Tubing supply
line:
•Turn the Handle of the Feed Water Saddle
Valve counter clockwise (outward) until the
lance does not protrude from the gasket. It
may have to be pushed in.
•Assemble the Feed Water Saddle Valve on
the tubing.
–for
3
/
8
" OD tubing use the back plate side
with the small groove to prevent dis tor tion of
the tub ing.
–for larger tubing (up to
5
/
8
" OD) use the
large groove of the back plate.
•Assemble and tighten the brass screw.
•To pierce the tubing, turn the Valve Handle
fully clock wise (inward). A small amount of
water may escape from the outlet until it is
fully pierced.
•When you feel the Valve Handle fi rmly
seated in the clockwise direction, the
copper tube is pierced and the valve is
closed.
2b. To install on (hard) Steel or Brass Tubing
supply line.
•The supply line should now be drained. Use
a battery powered or properly ground ed drill
to avoid shock hazard.
•Drill a
3
/
16
" hole in the supply line; (do not
drill through the opposite wall).
•Turn the handle to expose the lance no more
than
3
/
16
" beyond the rubber gasket.
•Place the body of the valve over the hole so
that the lance fi ts into the hole.
•Assemble and tighten the brass screw.
•Turn the Valve Handle clockwise (inward)
until fi rmly seated. The valve is closed.
3. With the Feed Water Saddle Valve closed,
open the sink faucet and the water supply
and allow the water to run for a few minutes
to fl ush any debris caused by the in stal la tion.
•Close the faucet and check the Feed Water
Saddle Valve for leaks.
C. Drain Clamp Installation
Choose the drain outlet location per Sec. III, C.5,
page 7.
The following are instructions for discharging into
the sink drain pipe. (Refer to Fig. 1, page 5.)
1. Position the Drain Clamp on the sink drain
pipe above the drain trap. Allow room for
drilling. Tighten securely.
2. Use a battery pow ered or properly grounded
drill. Using the Clamp port as a drill guide,
drill a
7
/
32
" hole through the wall of the drain
pipe. Do NOT penetrate the opposite side of
the pipe.
3. Locate the
3
/
8
" Black Drain Tubing connected
Summary of Contents for ECLIPSE WRO-35
Page 20: ...20 NOTES...
Page 23: ......