WATANABE WSPA-F2AL Operating Instructions Download Page 2

 

6-16-19, JINGUMAE, SHIBUYA-KU, TOKYO 150-0001, JAPAN 

TEL: +81-3-3400-6147    FAX: +81-3-3409-3156

 

 

2/4         

IM0873

-

00

 

 

Do not change settings during operation. 

 

The settings of this product can be stored in a DAT file. 

The settings also can be loaded from a DAT file to this 
product. 

However, do not load the settings from the 

DAT file that was created or edited with use of other 
than the setting tool to this product. Failure to 
observe this may cause malfunction or trouble, and 
then, we cannot guarantee proper operation of this 
product. 

* Refer to the instruction manual for the setting tool for 

further information.

 

 

7) Caution other than the above 

 

It takes 30 minutes to assure full performance of this 

product even this product can be operated immediately 

after turning on the power.

 

 

4. Dimensional Drawing

 

 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 

5. Circuit Configuration

 

 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

6. How to Mount

 

 
 
 

 

When mounting the product on a wall, refer to the installation 
dimension diagram. 
The  diagram  below  shows  the  minimum  mounting  clearance 
between adjacent units. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

7. How to Connect to/Disconnect from 

DIN Rail

 

 
 
 

 

1) How to secure the socket 
Engage the hook on the rear upper 
side of the socket with the rail with 
the slider on the bottom side of the 
socket downward, and press the 
lower side of the socket in the arrow 
direction as shown in the drawing to 
secure the socket.

 

2) How to secure the main unit to 

the socket 

Position the main unit so that the 
characters in the front label can be 
read in the appropriate direction, 
press the main unit into the socket, 
and screw the main unit to secure it.

 

 

 
 
 
 
 
 
 
 

3) How to disconnect the main unit 

from the socket 

Loosen the screws that secure the 
main unit, and pull the unit out in a 
straight line.

 

4

) How to disconnect the socket 

Put a flat head screwdriver into 
the slider slot of the socket and 
pull the lower side of the socket 
in the arrow direction 

 while 

pulling the screwdriver in the 
arrow direction 

.

 

 

 
 
 
 
 
 
 

 
 

8. How to Connect

 

 
 
 

 
 
 
 
 
 
 
 
 
 
 
 

Terminal 

No.

 

Sign

 

Description

 

 

INPUT1

 

+

 

These terminals receive the 
specified 
input signals.

 

 

COM

 

-

 

 

INPUT2

 

+

 

 

No.2 

OUTPUT

 

+

 

Signals are provided in accordance 
with the input/output specifications. 
(*1)

 

 

-

 

 

NC

 

 

No connection

 

 

No.1 

OUTPUT

 

+

 

Signals are provided in accordance 
with the input/output specifications.

 

 

-

 

 

NC

 

 

No connection

 

 

10 

POWER 

U(+)

 

Connect the rated voltage power 
supply.

 

 

11 

V(-)

 

 

 

*1 NC (no connection) for F2AL

 

* No line shall be connected to NC. 

 

Reviews: