15 September 2017
All Dimension are in mm………….Copyright ©
8
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
FLUE HEIGHT MINIMUM DETAILS
The flue exit is to comply to ASNZS 2918: 2001
3D View
FRAME OUT - TRIM OUT DETAILS FOR FLUE SYSTEM
Note: FLUE SYSTEMS casing
Flue system may require to be Doubled lined to comply.
Ref ASNZS:2918:2001 4.3 Flue pipe casing
Note:
External Requirements
Refer to AS/NZS2918:2001 4.9.1
Install flue system to AS/NZS2918:2001
When using a rubber or bitumen flashing (butynol,
dectite) an additional flue pipe baffle is required.
All external air vents & ceiling penetrations must
be bird proofed with permanently fixed screens.
All flashing to comply with E2.
FLASHING
—
TO COMPLY TO THE BUILDING CODE (E2)
Note: ROOF FLASHINGS GENERAL
Flashing are to be complaint to the building code and
the design will vary depending on the type of roof.
Each installation is unique and your Installer will advise
of the most appropriate flashing method to comply.