Page
51
INSTALLER/SERVICER NOTES
1. During the burner installation, check that the gasoil and bio fuel blends are in
accordance with Riello recommendations (please refer to the chapters “Technical
Data” and “Guidance for the use of bio fuel blends within the burner technical
manual).
2. If a Bio blend is in use the installer must seek information from the end user that
their fuel supplier can evidence that the blends of fuel conform to the relevant EN
standards.
3. Check that the materials used within the oil tank and ancillary equipment are
suitable for bio fuels. If in doubt contact relevant supplier or manufacturer.
4. Particular attention should be given to the oil storage tank and supply to the
burner. Warmflow recommends that existing oil storage tanks are cleaned,
inspected and any traces of water are removed BEFORE bio fuel is introduced
(Contact the tank manufacturer or oil supplier for further advice). If these
recommendations are not respected this will increase the risk of contamination
and possible equipment failure.
5. Warmflow recommends a good quality bio compatible oil filter at the tank and a
secondary filter are used to protect the burner pump and nozzle from
contamination. The filter sizes must be inline with the technical manual supplied
with the burners.
6. The burner hydraulic components and flexible oil lines must be suitable for bio
fuel use (check with Riello if in doubt).
7. Regularly check visually for any signs of oil leakage from seals, gaskets and
hoses.
8. It is strongly recommended that with Bio fuel use, oil filters are inspected and
replaced every 4 months. More regularly where contamination is experienced.
9. During extended periods of non operation and/or where burners are using oil as
a standby fuel, it is strongly recommended that the burner is put into operation for
short periods at least every three months.
Summary of Contents for Boilerhouse B120HE
Page 13: ...4 5 2 U Series Utility Casing Components Models up to 120 HE 150 HE Models Page 11...
Page 14: ...4 5 3 U Series Utility Pre Wired UHE Key Components Models up to 120 HE 150 HE Models Page 12...
Page 15: ...4 5 4 U Series Utility Pumped UPHE Key Components Models up to 120 HE 150 HE Models Page 13...
Page 17: ...4 5 7 K Series Kabin Pak Casing Components Models up to 120 HE 150 HE Models Page 15...
Page 19: ...4 5 9 K Series Kabin Pak Pumped KPHE Key Components Models up to 120 HE 150 HE Models Page 17...
Page 22: ...Page 20 4 5 13 Combi Pipe Layout UCHE KCHE Models...
Page 23: ...Page 21 5 TECHNICAL DETAILS 5 1 Combi Sequence of Operation Flow Chart...
Page 25: ...Page 23 5 2 3 U Series Utility 150HE Models 5 2 4 U Series Utility UCHE Models...
Page 27: ...Page 25 5 2 7 K Series Kabin Pak 150HE Models 5 2 8 K Series Kabin Pak Base Tray 150HE Models...
Page 28: ...Page 26 5 2 9 K Series Kabin Pak KCHE Models 5 2 10 K Series Kabin Pak Base Tray KCHE Models...
Page 41: ...Page 39 6 3 2 Wiring Schematic...
Page 66: ...Page 64 8 1 10 Kabin Pak Plume Management Kit KPMK The kit comprises...
Page 78: ...Page 76 13 BURNER FAULT FINDING 13 1 Riello RDB...
Page 79: ...Page 77 14 COMBI FAULT FINDING 14 1 Central Heating...
Page 80: ...Page 78 14 2 Domestic Hot Water...
Page 91: ......