Page 8
1.5.3 B-Series Boilerhouse (B120) – Key Components
8
1. Heat Exchanger
Assembly with Casing
2. Service Door Cover
3. Secondary Exchanger
Inspection Lid
4. Primary Exchanger Baffles
5. ‘Dual-Safe’ Thermostat
6. Service Door
7. Riello RDB 2.2 Burner
8. Flue Opening
9. Heating Flow
Connection x 2
10. Heating Return
Connection
1.5.4 U-Series Utility – Casing Components
1. Boiler Assembly
2. Top Casing (removable)
3. Rear Casing
4. Side Casing
5. Front Casing (removable)
1
2
3
4
5
6
7
9
10
1
2
3
4
5
Summary of Contents for B-Series B70
Page 1: ......
Page 2: ......
Page 72: ...Page 70 Notes...
Page 73: ...Page 71 Notes...
Page 74: ...Page 72 Notes...
Page 75: ......
Page 76: ......