Step 5
2x 70mm Screws
4x 60mm Screws
4
5
2
3
1
7
Place the support block with the short side on
the panel with the edge lining up with your
pencil mark, use x4 60mm screws to attach.
Put both Roofs on the top of the building
and place the roof truss up against the roof
and mark where the truss finishes on the
sides.
Place the roof truss in the centre of the
support blocks and secure through the top
of the roof truss into the support block with
x2 70mm Screws.
Step 6
Fix the roof panels on either
side as shown in diagram.
Ensure roof framing fits into slot
at top between the gable top
rafters and the roof truss.
Fix panels into position using
30x 30mm screws from the top
of panel, straight into the rafter
and roof truss. Pre drill holes
before hand.
Ensure the larger over hang
on both panels are facing
each other at the top point.
40x 30mm Screws
5
1
4
4
4
4
10mm Felt Tags
100mm
intervals
50mm
Overhang
Cut felt into 4 sheets and lay
onto roof as shown in
diagram ensuring there is a
50mm overhang around the
sides.
Fix using felt tacks at 100mm
intervals
Step 7
5
1
15
4
4
Step 8
Use 30mm screws to fix
each cover trim.
18x 30mm Screws
1
4
5
12
12
12
Summary of Contents for 01GRO1208DD-V1
Page 6: ......