background image

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(not supplied) including  a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are delivered pre-treated with a water based timber treatment 

however this only helps to protect during transit of your garden item. To 

validate your guarantee and for better protection against weathering it is 

highly recommended that you treat the garden building with a wood preserver 

within 3 months of assembly. This will need to be re-applied annually to ensure 

longevity of your building. Care must be taken when constructing the garden 

building that it is not touching the ground and is on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and 

annual treatment.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  The base should be slightly 

smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a run off for water. It is also recommended 

that the floor be at least 25mm above the surrounding ground level to avoid flooding.

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

This building should be erected by 

two people.

For ease of assembly,you must pilot 

drill all screw holes and ensure all 

screw heads are countersunk.

Whilst all products manufactured at Walton Garden Buildings Limited are made to the highest standards of Safety and in the case of childrens products 
independently tested to EN71 level, Walton Garden Buildings Limited cannot accept responsibility for your safety whilst erecting or using this product.

Length - 3638mm

Width - 2430mm

Height - 2282mm

Retain Instructions for future reference

Please retain product label (Attached to your building) for reference with all future contact

Before 

commencing assembly  

make sure you have a 

suitable base ready to 

erect your building 

 

Fixing Kit        

1480-95mm

(Facias)

 x4

1652-55mm

(Corner/side Trims)

x6

Shed Diamond

Finial x2

7

10

Felt

01GRO1208DD-V1

Contents 

Door Gable

1

Plain Gable

2

Window Panel x2

3

Plain Panel x2

5

6

Floor x2

Roof Panel

x4

7

Roof Truss

4

100-45mm

(Truss Support)

x2

8

9

10

11

12

120-27-45mm 

(Facia Blocks)

x4

120-12-45mm

(Tower Bolt Blocks)

 x1

1245-1449mm Horizontal Door Strip

1245-1732mm Vertical  Door Strip x2

18

19

20

21

22

Master 

Door

Slave 

Door

T-Hinge

Window x2

Window Strip 1055mm x2

23

24

Butt Hinge

x4

25

Nail Bag & Ironmongery Contents

Tower Bolt

Rim Lock

& Handle

15

13

17

Casement Stay

x2

14

132x30mm Screw 

5x60mm Screw  

20x40mm Screw 

Felt Tacks x180

15x20mm Screw 

50x50mm Screw  

3x70mm Screw  

8x30mm Black Screw 

16

12x16mm Screw 

Summary of Contents for 01GRO1208DD-V1

Page 1: ...rm ground to prevent distortion Refer to diagrams for the base dimensions The base should be slightly smaller than the external measurement of the building i e the cladding should overlap the base creating a run off for water It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding For Assistance Please Contact Customer Care on 01636 880514 2mm Dr...

Page 2: ...screw Place the opening window strip 11mm above the window gap in the window panel and fix with 3x30mm screws If you would like the windows to be opening use the butt hinges to attach the opening window strip and the opening window together Use 30mm screws to fix the butt hinge to the Window Strip and 16mm screws to fix it to the Opening Window If you want to fix the opening windows instead of fix...

Page 3: ...Alternate fixing positions along the length of the floors x10 50mm Screws 6 6 Step 3 Do not secure the building to the floor until the roof is fitted Fix the panels onto the floor using 50mm screws in align ment with the floor joists Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and cladding on all 4 sides x16 50mm Screws 2 Win...

Page 4: ...roof panels on either side as shown in diagram Ensure roof framing fits into slot at top between the gable top rafters and the roof truss Fix panels into position using 30x 30mm screws from the top of panel straight into the rafter and roof truss Pre drill holes before hand Ensure the larger over hang on both panels are facing each other at the top point 40x 30mm Screws 5 1 4 4 4 4 10mm Felt Tags ...

Page 5: ... the bar and fix with 2x30mm screws provided Fix the door handle onto bar with the flat headed grub screw as in diagram Rim lock Flat head Grub Screw 2x30mm screw 2x30mm screws Screws provided with lock Do not over tighten the screws 24 Attach the mounting block to top of the slave door with 2x30 screws Align tower bolts onto blocks and fix with 6x30mm black screws Step 11 6x 30mm Black Screws 21 ...

Page 6: ......

Reviews: