background image

Step 6

Use 30mm  screws to fix each 

cover trim

12 x 30mm screws

8

8

30mm 

screw

8

8

Place the Ridge Bar in between the 

front and back panels. Ensure the 

top corners of the support bar are 

flush with each top point. 

Step 7

60mm 

screw

8

8

2x60mm screws

Step 8

Fix two eaves frames to each sheet 

using 3x30mm screws per eave.

Fix the roof sheets to the roof using 

40mm screws directly through the 

OSB into the framing.

12 x 30mm Screws

20 x 40mm screws

7

10

7

30mm 

screw

40mm 

screw

Step 9

Cut felt into 2 sheets and lay onto roof as 
shown in diagram ensuring there is a 
50mm overhang around the sides. 

Fix using felt tacks at 100mm intervals

60 x felt tacks

Felt 

tacks 

14

Reviews: