background image

63

39

39

50

56

57

41

42

40

55

54

52

53

51

Glue tank supports (50) to base (51).  Glue loading rack supports (56 & 57) to base then glue rod (39) between loading rack 
supports at the back. Thread nozzles (63) on to other rod (39) then glue to loading rack supports at the front (as shown).  

Glue piping details (40 & 41) to part 42. Glue this between loading rack supports so that lugs at each end rest on the cross 
member. Glue loose end of nozzle pipes (63) to piping details (40 & 41)

The loading platform can now be glued so that the supports fit into the recesses on the platform – the front angle legs fit 
into the recesses on the underside of the ramp.
Fit steps and handrails as shown, and finally glue roof (58) in place.

Assemble the pump house, sign and unloading stand as shown. The 
gas pump and barrels can be placed anywhere in the scene.  Pump 
house should be placed as shown at the end of the pipe runs.

30

28

26

29

23

33

34

25

27

78

35

34

71

36

37

38

Reviews: