63
39
39
50
56
57
41
42
40
55
54
52
53
51
Glue tank supports (50) to base (51). Glue loading rack supports (56 & 57) to base then glue rod (39) between loading rack
supports at the back. Thread nozzles (63) on to other rod (39) then glue to loading rack supports at the front (as shown).
Glue piping details (40 & 41) to part 42. Glue this between loading rack supports so that lugs at each end rest on the cross
member. Glue loose end of nozzle pipes (63) to piping details (40 & 41)
The loading platform can now be glued so that the supports fit into the recesses on the platform – the front angle legs fit
into the recesses on the underside of the ramp.
Fit steps and handrails as shown, and finally glue roof (58) in place.
Assemble the pump house, sign and unloading stand as shown. The
gas pump and barrels can be placed anywhere in the scene. Pump
house should be placed as shown at the end of the pipe runs.
30
28
26
29
23
33
34
25
27
78
35
34
71
36
37
38