background image

EDR10512   r1   5/05

Document Part No. 99300805

© Leggett & Platt, Inc.

OPERATION GUIDE

www.lpadjustablebeds.com

Summary of Contents for s-cape II MR

Page 1: ...EDR10512 r1 5 05 Document Part No 99300805 Leggett Platt Inc OPERATION GUIDE www lpadjustablebeds com ...

Page 2: ......

Page 3: ...5 Powerdown Box Operation 5 S cape II MR Programming 1 hand control 1 bed 6 S cape II MR Programming 2 hand controls 1 bed 7 S cape II MR Programming 1 hand control 2 beds 8 S cape II MR Programming 2 hand controls 2 beds 9 S cape II MR Reprogramming separating 2 beds 10 ...

Page 4: ...FOOT UP DOWN BUTTON Adjusts the head foot sections of the bed to the desired position HEAD FOOT MASSAGE ARROW BUTTONS Slowly increases or decreases the intensity of the massager as long as the appropriate button is pressed WAVE ARROW BUTTONS Once the massagers are activated and the wave feature is selected these buttons increase or decrease the speed of the wave MASSAGE ON OFF BUTTONS Turns on or ...

Page 5: ... is designated disconnecting and reconnecting the electrical power cord will achieve the same function Note that this alternate programming feature is only applicable to beds without a power down box Power down equipped adjustable beds require use of the learn button when programming the hand control POWERDOWN BOX OPERATION In case of a power outage press and hold the learn button on the power dow...

Page 6: ...press and hold the Pos 1 and the head massage on off buttons The transmission indicator light will flash slowly and then flash rapidly Continue to hold for 2 seconds and then release the buttons FIGURE 2 One hand control is now programmed to operate one bed FIGURE 1 Power down box and J box receiver units J BOX POWER DOWN BOX LEARN BUTTON LEARN BUTTON NOTE POWER DOWN BOX IS NOT MOUNTED TO BED FRAM...

Page 7: ...nd the head massage on off buttons The transmission indicator light will flash slowly and then flash rapidly Continue to hold for 2 seconds and then release the buttons FIGURE 2 STEP 3 Repeat Step 1 and Step 2 with hand control 2 Two hand controls are now programmed to operate one bed FIGURE 1 Power down box and J box receiver units J BOX POWER DOWN BOX LEARN BUTTON LEARN BUTTON NOTE POWER DOWN BO...

Page 8: ...Pos 1 and the head massage on off buttons The transmission indicator light will flash slowly and then flash rapidly Continue to hold for 2 seconds and then release the buttons FIGURE 2 STEP 3 Repeat Step 1 and Step 2 for bed 2 One hand control is now programmed to operate two beds FIGURE 1 Power down box and J box receiver units J BOX POWER DOWN BOX LEARN BUTTON LEARN BUTTON NOTE POWER DOWN BOX IS...

Page 9: ...eat Step 1 and Step 2 with hand control 2 STEP 4 On bed 2 press the learn button for 1 second and release The bed will be equipped with either a power down box or J box FIGURE 1 STEP 5 On hand control 1 simultaneously press and hold the Pos 1 and the head massage on off buttons The transmission indicator light will flash slowly and then flash rapidly Continue to hold for 2 seconds and then release...

Page 10: ...before proceeding to Step 4 STEP 4 On bed 2 press the learn button for 1 second and release The bed will be equipped with either a power down box or J box FIGURE 1 STEP 5 On hand control 2 simultaneously press and hold the Pos 1 and the head massage on off buttons The transmission indicator light will flash slowly and then flash rapidly Continue to hold for 2 seconds and then release the buttons F...

Reviews: