Revision 3
21
SNC-02 Product Manual
5.5 Commissioning for Use
1. Fully open the water supply isolating tap. Check the system for leaks.
2. Operate the all shower outlet supplies available. Operate the water several times
to make sure all air has been purged from the system.
3. Ensure that the flow rate is correct, and the shower
nozzle’s pattern is fully filled.
4. Where a thermostatic mixer valve (not supplied) is fitted to the plumbing system
for the outlet, you may have to adjust the valve to set the correct hot water
temperature. If so, you should do so in accordance with the instructions supplied
by the manufacturer of the thermostatic mixer valve.
5. Leave a copy of this Product Manual with the person responsible on site.
5.6 Technical Specifications
Table 1. Technical specifications
Ceiling Shower Technical Specification
Weight
0.5 Kg
Dimensions
ø130mm (W) x 27mm (H) (1.8mm dia outlet holes).
Maximum Operating
Water Temperature
+85°C
Water Supply
Minimum pressure: 2 Bar (Static)
Maximum Operating Pressure: 5 Bar (72psi, 500kPa)
(Dynamic).
Supply pipe size ½” BSP
6. User and Maintenance Instructions
The ceiling shower nozzle is designed and manufactured from high-quality materials.
With correct installation, operation and maintenance, as described by the instructions
given in this manual, the unit will give reliable, efficient service. If you need any
further information or advice, please contact Wallgate customer services.
Wallgate offers a comprehensive service package, details of which can be obtained
from our customer service department.
Summary of Contents for SNC-02
Page 1: ...Product Manual SNC 02 Ceiling Mounted Shower Head ...
Page 2: ...Revision 3 2 SNC 02 Product Manual ...
Page 9: ...Revision 3 9 SNC 02 Product Manual Figure 1 Ceiling mounted shower head ...
Page 10: ...Revision 3 10 SNC 02 Product Manual Figure 2 Ceiling mount shower head exploded view ...
Page 20: ...Revision 3 20 SNC 02 Product Manual Figure 7 Ceiling shower spray pattern ...