background image

Pre-delivery Inspection

Inspect for damage from shipping. Immediately contact the 

shipping company if damage is found. 

Wood Processor

Hydraulic Splitter Controls Function
Hydraulic Cylinder Functions
Splitter Chute Folds Up
Wedge Height Adjuster Functions
Loader and Lead-in Chutes Fold Up and Latch Securely
Log Stabilizer Moves Freely
Fasteners Tight
Grease Zerks / Lubricate Pivot Points
Pivot Tongue Moves Freely
Hydraulic Connections
Review Operating and Safety Instructions

Safety Checks

All Safety Decals Installed
Guards and Shields Installed and Secured
All Jacks Function
Retainer Installed Through Hitch Points
Review Operating and Safety Instructions

Hydraulic Winch

Check Winch Clutch Handle Control
Check Winch Rope / Hook / Fairlead
Check Hydraulic Function
Review Operating and Safety Instructions

Optional Equipment

Chain Saw Holster: Installed securely
6 Way Wedge: Check Height Adjuster
Chainsaw Pivot: Check Pivot Function

WP240 / WP270 Set-up Instructions

9  

Summary of Contents for WP240

Page 1: ...Firewood Processor SET UP INSTRUCTIONS PRINTED IN CANADA Rev Aug 2018 Part Number Z97115_SI WP240 270_July 2018 EMB Manufacturing Inc 4144 Boomer Line St Clements ON N0B 2M0 Canada www wallensteinequ...

Page 2: ...use electrocution Contact with obstructions can damage components or cause them to fail Keep the assembly area clean to prevent slipping or tripping Use a hoist when lifting components that weigh 50 l...

Page 3: ...nd some parts are attached to skid with screws IMPORTANT Inspect for damage from shipping Immediately contact the shipping company if damage is found WP240 WP270 Set up Instructions WP240 WP270 Set up...

Page 4: ...ware not reused A Bottom Chute B Lead In Chute C Log Chute D Splitter Chute E Winch Strap Hardware is located inside Operators Manual Tube D B A C E NOTE WP270 is shown WP270 and WP240 are similiar WP...

Page 5: ...WP240 WP270 Set up Instructions 3 4 4 3...

Page 6: ...5 WP240 WP270 Set up Instructions 2X 2X 2X 2X C A...

Page 7: ...WP240 WP270 Set up Instructions 6 2X B 7 E WP240 WP270 Set up Instructions...

Page 8: ...WP240 WP270 Set up Instructions 8 D D B B A WP240 WP270 Set up Instructions...

Page 9: ...nts Pivot Tongue Moves Freely Hydraulic Connections Review Operating and Safety Instructions Safety Checks All Safety Decals Installed Guards and Shields Installed and Secured All Jacks Function Retai...

Page 10: ...are identified by their head markings Imperial Bolt Torque Specifications Bolt Diameter Torque Value SAE Gr 2 SAE Gr 5 SAE Gr 8 lbf ft N m lbf ft N m lbf ft N m 1 4 6 8 9 12 12 17 5 16 10 13 19 25 27...

Page 11: ...ond Torque to values shown If a torque wrench is not available use the FFFT Flats From Finger Tight method Hydraulic Fitting Torque Tube Size OD Hex Size Across Flats Torque value Flats From Finger Ti...

Page 12: ...EMB Manufacturing Inc 4144 Boomer Line St Clements ON N0B 2M0 Canada www wallensteinequipment com...

Reviews: