![Wallbox Power Boost Installation Manual Download Page 16](http://html1.mh-extra.com/html/wallbox/power-boost/power-boost_installation-manual_3243788016.webp)
16
9.1.
Select GO.
9.2.
On the Systems screen, scroll down to
2P
and press
Enter.
9.3.
Continue to the Ct rAt Menu
9.4.
Press OK.
9.5.
Set the
Ct rAt value up to 50
, so that it matches
with the 250 A clamps supplied.
9.6.
The meter has been successfully configured.
Installation
POWER METER INSTALLATION