3-
B LOWER
CONNECTION
(I-7.1, I-7.2 and I-7.3)
• Step
3
-B.1: Proceed to fix the charger to the wall. Insert the screws in the marked positions,
starting at the top and following a clockwise direction (I-7.1). Check that your Wallbox
Commander is firmly fixed to the wall.
• Step
3
-B.2: Insert the power supply cables through the cable connector (I-7.2, I-7.3)
•
Step 3-B.3: Make sure the previous steps have been completed correctly.
Connect the neutral and
earth power lines to the terminal according to the
supply configuration
(I-7.2, I-7.3)
Single-phase setup (1P) (I-7.2)
From left to right:
L1 (Current line)
N
(N
eutral line
)
Protective earth (If network not IT)
Three-phase setup (3P) (I-7.3)
From left to right:
L1, L2, & L3 (Current lines)
N:
(N
eutral line
)
Protective earth (If network not IT)
en
8
In the event that the supply scheme does not include a neutral line connection with a voltage
lower than 145 V, follow the next configuration steps:
Bi-phase setup (2P)
From left to right:
L1 (Current line)
N
(Current line)
Protective earth (If network not IT)
The colours shown are not subject to international standards. Always check the correct
connection.
In the event that the earthing system is IT follow the configuration steps
in
CONFIGURING IT NETWORK section
.
5.
CLOSURE OF THE DEVICE
•
Step 3.1: Reconnect the cover communication cable.
•
Step 3.2: Close the front cover, taking special care with the
fitting
and ensuring that
the
O-
ring remains in place.
•
Step 3.3: Secure the cover by tightening the Torx screw.
In case it is needed to reopen the device, use only the tool (I-9) provided for this procedure
included in the Wallbox box. The use of any other tool or means may cause damage in the
charger, which wouldn't be covered by the product warranty.
4.
ETHERNET CONNECTION
The charger can be connected to the internet using a built-in Ethernet port installed on the
module cover.
• Step 1. Insert the Ethernet cable through the bushing.
• Step 2. Connect the cable to the Ethernet port (I-7.4)