background image

Installation

en

 Place the 

85DU

 onto the blower unit as shown in picture below.

Install and tighten M4x12 screws (4 pcs) (supplied with blower unit).

Connect the cable between 85DU and 270

Remove the connection cable from printed wire board (older version) or remove 

the shortcut piece from printed wire board.

Connect blower lid to printed wire board (to the place where you removed the old 

connector).

Use cable tie to fasten the cable.

Please assure that the cable and fuel tube will not contact the tangen-

tial blower or exhaust pipe.

Insulate either the fuel tube or exhaust pipe if needed.

D10231B

- 7 -

490536B

     270

Reviews: