Assembly Instructions
18
Deck Discharge Shield Installation (DSD60)
Attach the deck side discharge shield by positioning
the shield hinge lug in
front
of the deck mount and
fastening with two (2) 3/8-16 x 1-1/4 in. bolts, 3/8-16
ESNA nuts, and 3/8 in. wave spring washers. The
wave washers fit between the two hinging surfaces.
Tighten the nuts until the shield moves freely but is
not loose.
WARNING
DO NOT operate the machine without the
grass deflector chute attached and in the
lowest possible position.
Attach Shield
Deck Discharge Shield Installation
PTO Shaft Guard Installation
Position the shaft guard as shown and mount with
two (2) 1/4-20 x 1/2 in. bolts.
Carrier Frame
Tube Sockets
Attach
Guard
PTO Shaft Guard Installation
Tilt-Up Roller Wheel Installation
Mount the two (2) tilt-up roller wheels on the brackets
on the rear skirt of the deck housing using the
P/N 8490 axle bolt, 3/8 in. wave spring washer and
3/8-16 in. Whiz locknut. Tighten the axle bolt until the
wheel rolls freely, but is not loose.
Roller Wheel
Roller Wheel Installation (DSD60 Shown)
Mower Deck Installation on Tractor
Deck Installation
1. Lightly grease each deck support arm (2) on the
tractor. Refer to
Mower Deck Installation
pho-
to for location of deck support arm.
2. Engage the LH deck carrier frame tube socket
first on the tractor support arms and then the RH
tube socket, slide the deck onto the support arms
approximately 3 in. (76 mm).
Retract Coupler Ring