27
Read and understand the Operator’s Manual and all safety signs before operating,
maintaining , adjusting or repairing the Ultra-Veyor System.
4.6 OPERATING
Before servicing, adjusting, repairing or maintaining
unit, ensure that unit power source is completely
shut down and can not start up.
Establish a Lock-Out Tag-Out program for the
worksite.
Do not operate when any guards are damaged or
removed, Install and secure guards before starting.
Keep hands, feet, clothing and hair away from all
moving and/or rotating parts.
Lock-out tag-out master panel before opening
airlock door.
Clear the area of all bystanders, especially small
children, before starting.
Before supplying electrical power to the ma - chine,
be sure you have adequate amperage at the proper
phase and voltage to run it. If you do not know or
are unsure, consult a licensed electrician.
Ground all lines and hoses to prevent static build-up
and electrical discharge.
Maintain electrical continuity between material
intake and airlock/blower to prevent sparks, shocks
or electrical discharges.
Wear appropriate ear protection when operating
machine.
Review safety instructions annually.
When operating the Ultra-Veyor System, follow this
procedure:
1. Clear the area of bystanders, especially small
children, before starting.
2. Review and follow the Pre-Operation Checklist
(See Section 4.4).
3. Before starting the system in an automatic
operation consider the following:
i
Start system manually to ensure blower
and airlock turn freely.
ii
Check all product lines, switch hoses to each
line.
iii
Manually run the blower without product.
Check pressure guage to ensure each line is free
of obstructions.
Summary of Contents for ULTRA-VEYOR SYSTEM
Page 1: ...ULTRA VEYOR SYSTEM OPERATOR S MANUAL...
Page 2: ......
Page 4: ......
Page 19: ...17 3 SAFETY SIGN LOCATIONS Think SAFETY Work SAFELY B A B B SAFETY DECALS BLOWER B A A...
Page 53: ...51...
Page 55: ......