7 OPERATION
7.1 TRAINING THE OPERATING PERSONNEL
– The operating personnel must be qualified to operate the entire system.
– The operating staff must be familiar with the potential risks associated with improper
behavior as well as the necessary protective devices and measures.
– Before work commences, the operating personnel must receive appropriate system
training.
7.2 EMERGENCY STOP
In the case of unforeseen occurrences immediately:
1. Close ball valve (2).
2. Open return valve (3).
B_03917
3
2
53 MPa
530 bar
7687 psi
A
B
3
3
27 MPa
270 bar
3916 psi
27 MPa
270 bar
3916 psi
B
B
A
Close
B
Open
7.3 TASKS
Ensure that:
commissioning is carried out in accordance with Chapter Start up [
46].
1. Carry out a visual inspection: Personal protective equipment, grounding and all devices
ready for use.
2. Secure spray gun and insert nozzle into the spray gun.
3. Close return valve (3).
4. Slowly open the ball valve (2).
5. Set required working pressure on the pressure regulator (1).
6. Optimize spray pattern in accordance with the spray gun's operating manual.
7. Start work process.