Operating manual GA 5000EAC Electrostatic Automatic Spray Gun (AirCoat)
6 Assembly and Commissioning
30
Order number 2360922 | Edition 09/2022
6 ASSEMBLY AND COMMISSIONING
6.1 TRAINING OF ASSEMBLY/COMMISSIONING PERSONNEL
– The assembly and commissioning personnel must have the technical skills to safely
commission the device.
– When assembling, commissioning and carrying out all work, read and follow the
operating manuals and safety regulations for the additionally required system
components.
A skilled person must check to ensure that the device is in a reliable state after it is
assembled and commissioned.
6.2 STORAGE CONDITIONS
Until the point of assembly, the device must be stored in a dry location, free from vibrations
and with a minimum of dust. The device must be stored in closed rooms.
The air temperature at the storage location must be between -20 °C and +60 °C (-4 °F and
+140 °F).
The relative air humidity at the storage location must be between 10 and 95% (without
condensation).
6.3 INSTALLATION CONDITIONS
The air temperature at the installation site must be in a range between 0 °C and 40 °C; 32 °F
and 104 °F.
The relative air humidity at the installation site must be between 10 and 95% (without
condensation).
6.4 ASSEMBLY AND INSTALLATION
6.4.1 Typical Electrostatic Spraying System
The GA 5000EAC spray gun must be combined with various components to make up a
spraying system. The system shown in the figure is only one example of a spraying system.
Your WAGNER distributor would be happy to assist you in creating a spraying system
solution that meets your individual needs.
You must familiarize yourself with the operating manuals and the safety regulations of all
additional system components before starting commissioning.