Installation I 7
ELECTRICAL INSTALLATION
Electrical installation must be done in accordance with applicable law and regulations by
qualified and authorized personnel.
Electricity is supplied to the unit through a power cable with a standard EU plug for 230V. The
connecting cable for the external control and the preheater is to be connected directly to the cen-
tral control board. The cover board is attached with four screws. Release the four screws and lead
the cables of external activators through cable grommets (holes) that may be broken out accord-
ingly.
Attachment of the adapter board
The external controller may be mounted on a standard switch box. 8-pole terminal block of the
external controller is connected to a 4-pole terminal block X0 of the central control board with a 4
venous shielded cable (type J-Y(ST)Y 2x2x0,6).
Control board connecting terminal X0
Contact labeling
X0 01
+12V
X0 02
Us (intake ventilator control voltage)
X0 03
Ue (outtake ventilator control voltage)
X0 04
GND
Table 02:
Terminal block for X0 connection of the control board.
1.
Push out rotary
button
2.
Release screw
3.
Take of top cover
4.
Clamps for external
controller
Figure 02:
External controller.
Summary of Contents for 200 E
Page 1: ...USER MANUAL WAFE 200 E Energy Recovery Ventilation Unit v1 0...
Page 2: ......
Page 14: ...14 I Notes NOTES...
Page 15: ...Pozn mky I 15...
Page 16: ...16 I Notes...
Page 17: ......