background image

Contents, specifications and availability are subject to change without notice.

Tel. (860) 664-4911 • Fax. (860) 664-4912 • www.waecousa.com    

WAECO USA, Inc. 

1

WAECO USA • Clinton, CT •

www.waecousa.com

Installation &

Operating Manual

FRONT LOADING 

COMPRESSOR REFRIGERATORS / FREEZERS

RPD Series

RPF Series

RSD Series

RSF Series

 

 

 

 

 

 

 

Summary of Contents for RPD Series

Page 1: ...to change without notice Tel 860 664 4911 Fax 860 664 4912 www waecousa com WAECO USA Inc 1 WAECO USA Clinton CT www waecousa com Installation Operating Manual FRONT LOADING COMPRESSOR REFRIGERATORS...

Page 2: ...ate medicines first check if the refrigerator s cooling capacity meets the demands of the respective remedies The refrigerator is designed to operate in ambient temperatures between 14 F and 130 F in...

Page 3: ...ATTENTION The refrigerator may need up to 60 seconds for the compressor to start TAKING OUT OF SERVICE If you wish to switch off the refrigerator for longer periods of time disconnect the AC supply o...

Page 4: ...the position of the fastener 5 and hinges 1 and add the door TRANSPORT LOCKING SYSTEM 1 Door is closed and secured 2 Securing device inactive door can be opened 3 Door secured in vent position door is...

Page 5: ...WAECO USA Page 5 CONNECTION DIAGRAM...

Page 6: ...WAECO USA Page 6 REMOTE MOUNTING THE COOLING UNIT For RPD RSD RSF APPLIANCES The detachable cooling unit can be installed separately...

Page 7: ...with electronics Electronics defective Replace electronics Interruption in compressor s electronic system between the pins Compressor defective Replace compressor Interior temperature too low at ther...

Page 8: ...m an authorized service agent for one year from date of purchase or third party installation For OEM factory installed prod ucts the duration is one year from the date of purchase of the vehicle vesse...

Reviews: