Initial startup
VAS 6380B / VAS 6381B
14
7
Initial startup
7.1
Setting up and switching on
1. Wheel the AirCon Service Center to the workplace and lock the front
wheels (
9
).
I
2. Connect the AirCon Service Center to the mains.
3. To switch it on, set the main switch (
20
) to I.
The display (
6
) shows the software version number for several
seconds:
“SW”
: Software status
“DB”
: Database
“SN”
: Serial number
✓
Afterwards the AirCon Service Center runs a software test.
✓
When the start-up procedure is complete, the AirCon Service Center
displays the following:
NOTE
During operation, the device must be on a level, flat surface so that
measurements can be made correctly.
D o m e t i c W a e c o I n t .
V A S 6 3 8 1 B S W V A 2 0 0 0 1 2
D B l h d 1 0 0 2 6
S N 0 0 0 0 2 0
S o f t w a r e t e s t .
P l e a s e w a i t !
R e f r i g e r a n t g .
P A G O i l m l .
U V T r a c e r m l .
1 1 : 5 6 : 3 5 1 0 : 0 3 : 2 0
WaecoVAS6380B-6381B_OPM_4445101232_AMER(us)_202x-xx-xx.book Seite 14 Montag, 2. November 2020 4:18 16