![WADER Goldseal Plus Operator'S Manual Download Page 3](http://html.mh-extra.com/html/wader/goldseal-plus/goldseal-plus_operators-manual_866874003.webp)
Goldseal Plus
Operators manual
To Operate the Hand Press
Ensure that the temperature & Timer setting are correct.
You may check your settings at any time simply by pressing the
key and the temperature set-point will be displayed, press
again and the timer
set-point will be displayed, press
a third time and the control goes back to the standard screen display
Place the part of the garment/article to be marked onto the silicone pressure pad.
Pull the handle forward into the locked position, ensuring the garment is firmly clamped between the heat plate and pressure pad. (Make sure that your
hands are away from the heated platen when using the heat press).
The timer display will now start a countdown.
After completion of the above the buzzer will sound when the pre-set time has elapsed and
t.End
(timer end) will be displayed, the handle
should then be lifted back to it full extent.
Before operating the machine at the start of each day carry out a sealing procedure without any garment or transfers this will remove any
moisture from the pad
.
Pressure Pad Assembly
The silicone pressure pad and assembly should be maintained and kept in good condition at all times.
A worn silicone pressure pad will effect the quality of transfer marking / fusing and should be replaced when showing signs of wear. (
See parts list
).
After a long duration of time it may be found that there is a loss of pressure through the pressure pad assembly, this can be rectified by replacing the pressure springs
located under the pressure plate.
Never allow the heat plate to rest on the silicone pressure pad when the press is not in use.
PTFE Heat Plate Cover
A PTFE cover is fitted to the heat plate, which allows the surface to be wiped clean should it become marked.
New PTFE covers may be fitted to the heat plate when
WARM
(not hot)
and has been cleaned to remove residue of the old PTFE.
Design Change
With a policy of constant improvement and/or modifications to meet changing conditions, the right is reserved to change the design and/or specifications at any time
without prior notification, therefore no guarantee can be given as to the accuracy of the information contained in this instruction book.
Guarantee
This press is guaranteed to be free from defects in materials and workmanship
**
for a period of 12 months from the proven date of delivery or installation.
Should, in our opinion, any part of this press be defective in materials or workmanship it will be replaced or repaired free of charge
(excluding any travelling costs /
carriage costs which will be charged at our discretion)
provided that the press has been installed and operated in the correct manner and not subjected to misuse.
A charge will be made for any costs incurred if a reported fault on the press is found to be due to incorrect installation, operation and/or incorrect materials being
used, as it is the responsibility of the press user to ensure the suitability of the materials operating through the press.
**
Exclusions - Pressure Pad GSW-16, PTFE GSW-
18
Application details for Wader Products
Your press should have the following settings: -
Temperature: -
204
°
C
(application dependent)
Pressure: -
20 PSI
Time Dwell: -
8-10 seconds
The above is only a basic guideline you may need to change settings for special materials. To alter the settings see page 3.
We recommend that THERMAL materials / clothing are not used on this heat press.
It is also recommended not to apply heat seal labels to existing garment labels.
Contact Sales For Special Material Settings.
Specifications
Supply Voltage 230 / 240 Volt AC. 500watt (8x6 - 700 Watt)., Microprocessor PID Temperature/Timer Control Unit.
Allowances should be made when P.A.T. testing
.
240v Mica plate heating element including 40" leads and integral earth.
Cast Aluminium construction. Dry weight of 14 kg (8x6 15 kg).
Maintenance
Lubricate toggle linkage at
regular intervals
with light machine oil, this will ensure a long life of the toggle assembly and also a smooth operation.
Keep top PTFE cover in good condition.
Ensure that the silicone pad is in good condition.
Never clean the machine with abrasive cleaners or solvents that may damage the product.
Check all fasteners are tightened to the correct torque. This is particularly important with the heat plate fixing as these are under extreme heat and strain.
This machine is designed for application of heat-seal transfers, tape, badges and patches only.
Please ensure the manufacturers operating instructions are adhered to.
A colour copy of this manual plus all the Wader machinery can be downloaded from the website www.wader.co.uk
We recommend a qualified engineer inspect the machine at six Monthly intervals
3