![Wacker Neuson LTN 6K-V Operator'S Manual Download Page 35](http://html1.mh-extra.com/html/wacker-neuson/ltn-6k-v/ltn-6k-v_operators-manual_3148319035.webp)
wc_tx003098gb.fm
35
LTN
Operation
4
Operation
4.1
Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, including fuel, engine oil, and battery acid.
6. Move the machine to its operating location.
4.2
Generator Derating
Description
All generator sets are subject to derating (reduced power output) depending on the
altitude and ambient temperature. Derating should not affect the operation of the
floodlights, although it will reduce the available reserve power to the receptacle.
Derating
percentages
Power ratings are typically reduced by the following percentages:
3% per 300 m (1000 ft.) elevation above sea level
2% per 5.5°C (10°F) increase in ambient temperature above 25°C (78°F).