![Wacker Neuson DPU 25 Series Operator'S Manual Download Page 30](http://html1.mh-extra.com/html/wacker-neuson/dpu-25-series/dpu-25-series_operators-manual_3267736030.webp)
11 Maintenance
30
100_0202_mt_0005.fm
11.1
Maintenance schedule
11.1.1
One-time maintenance after initial operation
Note:
The following maintenance tasks need only be performed after initial opera-
tion at this interval.
11.1.2
Daily maintenance work
Maintenance work
After the first
25 hours
Change engine oil.
Check the valve clearance, set to 0.10 mm when the engine is cold. *
*
Have these tasks carried out by the service department of your Wacker Neuson contact
person.
Maintenance work
Daily before op-
eration
Daily after oper-
ation
Check the intake area of the combustion air and
cooling air.
Check engine oil level.
Check water separator.
Check fuel tank:
Fuel level.
Leaks.
Lines for leaks.
Check the tank seal for leaks – change, if
necessary.
Clean or replace the filter element as needed.
Check that Bowden cable moves freely.
Clean the machine.